Laserfiche WebLink
EXHIBIT A - PROPOSAL <br />7AINT BLAST US <br />SUPERIOR PAINTING SERVICE <br />Proposal # S -145 Submitted to: <br />City of Santa Ana - Public Works <br />Company Agency <br />Name Sean Thomas. P.E. <br />Stencil Blast US Inc. ribs Paint Blast US <br />License #1084260 I DIR # 1000853906 <br />WOSB # WOSB220579I WBENC # WBE2200951 <br />#2026848 <br />PO Box 1196, Sunset Beach, CA 90742 <br />Phone: (714) 395-6173 <br />info@paintblastus.com <br />www.PaintB[astUS.com <br />Work to he net lormed at <br />Project Name <br />Address 20 Civic Center Plaza Address <br />City, State ZIP Santa Ana, CA 92701 City <br />Phone 714-647-5656 ZIP <br />Public Arts: Sidewalk Poetry <br />S Main St Intersections <br />Santa Ana, CA <br />92707 <br />Email sthomas5@santa-ana.org Project Contact Phone 714-647-5656 <br />Scope of Work: <br />Produce rubber stencils, apply, sandblast, and paint sidewalk locations on South Main St, Santa Ana, using city -provided poetry <br />text. <br />Project Details: <br />Paint Blast US will notify nearby businesses of the work to be completed at least one week prior to the start date. "No parking" <br />notices will be placed in necessary locations at least 72 hours in advance. Cones and a mobile containment unit will be used at <br />each location. Additional protection and coverage around work areas will be provided as needed (e.g., covering nearby furniture, <br />windows, etc.). <br />The scope Includes 30 Decorative Sandblast Designs. Finish color: black. Paint Blast US will collaborate with the city and its artists <br />to prepare and finalize designs for optimal on -site application. Drawings for approval will be supplied by Paint Blast US before <br />stencil production commences. All stencil materials are for one-time use. Location will be finalized with the assistance of city <br />representatives and Blue Mountain Development. <br />Paint Blast US will begin "silent set up" between 6 to 7 AM*. The crew will place cones, sweep/prep the area, complete protection <br />around local businesses, and install the stencils. Noise will be kept to a minimum to avoid disruption to local residents and <br />businesses. After 8 AM, Paint Blast US will begin the sandblasting portion of the work. Once sandblasting is completed at a <br />location, Paint Blast US will sweep the surrounding area and proceed with the final steps of painting the etched poetry text. The <br />final step will be the removal of stencil material, cones, barriers, and containment. Once all work is completed, residents are free to <br />use the sidewalk as needed. Paint Blast US aims to complete approximately 4 poetry locations per day. All work will be completed <br />within a 10-working-day period. Crews will be scheduled around street sweeping schedules to avoid any issues during those days. <br />No sandblasting to be done after 5PM. A $2.250 material deposit will be required prior to the start. Cost per location: $1,300. <br />not incloiled/Exclusions: <br />Off hours work. Plant cleaning. Protection of unauthorized vehicles. Any locations outside of the provided work areas. Anything not <br />clearly listed in the above "Scope of Work" is not included in this proposal. <br />Special Conditions: <br />No other trades should be working within 25' from sandblasting. Estimated time - 8 to 10 working days for stencil application and <br />painting for all locations. Lead time for stencil production - 2-3 weeks. Initial text for stencil production should be provided to Paint <br />Blast US at least 2 weeks prior to project start. Cleanup will be done only off hardscape. No people should be present within the <br />contained sandblasting areas. Plan with updated markers locations should be provided 2 weeks prior to mobilization. <br />*Start time of any work may be adjusted at the City's discretion. <br />Note: All work is guaranteed as specified above and will be performed as per instructions of <br />contractor. The above work will be completed in a workmanlike manner for the sum of. $39,000.00 <br />with payments to be made as follows: Not 30 <br />7/18/2024 Nad4w0 <br />Submitted by (Company Representative( <br />(MAXIMUM LIABILITY INSURANCE $1,000,000) (WORKMANS COMP INSURANCE AS REQUIRED BY LAW) <br />