My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGION CONTRACTORS, INC. (OUTDOOR LIBRARY AT JEROME PARK)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LEGION CONTRACTORS, INC. (OUTDOOR LIBRARY AT JEROME PARK)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:48:02 PM
Creation date
12/11/2024 4:56:18 PM
Metadata
Fields
Template:
Contracts
Company Name
LEGION CONTRACTORS, INC.
Contract #
P22-1381 & 25-7523
Agency
Public Works
Council Approval Date
8/20/2024
Insurance Exp Date
11/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 22-1381; Outdoor Library at Jerome Park Change Order Number 2 <br />To Legion Contractors, Inc, Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE; THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. To compensate the contractor for replacing the existing two light poles located at the South <br />West corner of Jerome Park. Reference PCO #4 dated December 16, 2024. <br />AGREED PRICE = $6,542.00 <br />2. To compensate the contractor for additional forming, expansion joints, and saw cuts for the <br />revised layout for the seat wall area. Reference PCO #5 dated January 12, 2025, and RFI <br />#16 response provided on January 13, 2025. <br />AGREED PRICE = $3,091.21 <br />3. To compensate the contractor for installing additional 6-inch wide flush concrete curb along <br />planting areas. Reference PCO #6 dated February 11, 2025. <br />AGREED PRICE = $41,600.00 <br />4. To compensate the contractor for modifying the concrete pipe tunnel holes to be 10-inches <br />per RFI #21. Reference PCO #7 dated February 14, 2025. <br />AGREED PRICE = $4,000.00 <br />5. To compensate the contractor for the additional layout, forming, hand digging, and placing <br />concrete for the bench installation on permeable paving areas per RFI #20. Reference PCO <br />#8 dated February 14, 2025. <br />AGREED PRICE = $2,456.85 <br />TOTAL AGREED PRICE = $57,690.06 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.