My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGION CONTRACTORS, INC. (OUTDOOR LIBRARY AT JEROME PARK)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LEGION CONTRACTORS, INC. (OUTDOOR LIBRARY AT JEROME PARK)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 1:31:05 PM
Creation date
12/11/2024 4:56:18 PM
Metadata
Fields
Template:
Contracts
Company Name
LEGION CONTRACTORS, INC.
Contract #
P22-1381 & 25-7523
Agency
Public Works
Council Approval Date
8/20/2024
Expiration Date
1/1/1900
Insurance Exp Date
11/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. To compensate the contractor for providing and installing Freenotes Mushrooms drum sets. <br /> Reference PCO #18.1 dated June 26, 2025. <br /> AGREED PRICE =$14,892.16 <br /> 8. To compensate the contractor for changing the existing area drain to a 18" x 18" catch basin. <br /> Reference PCO #19 dated June 24, 2025. <br /> AGREED PRICE=$6,908.90 <br /> 9. To compensate the contractor for revising the bike play track sizes and install additional <br /> lettering over the Poligon vinyl wrap. Reference PCO #20 dated July 15, 2025. <br /> AGREED PRICE=$2,700.00 <br /> 10.To compensate the contractor for removing and replacing the dying tree near the parking lot. <br /> Reference PCO #21 dated July 26, 2025. <br /> AGREED PRICE =$15,424.20 <br /> 11.To compensate the contractor for power washing, painting, and applying anti-graffiti coating <br /> to all light pole bases in the park. Reference PCO #22.2 dated August 1, 2025. <br /> AGREED PRICE =$15,540.00 <br /> 12.To compensate the contractor for additional work requested from the punch list meeting <br /> including: door stops for the Poligon shelter, adding bolt caps to signage, and spare <br /> equipment. Reference PCO #23 dated August 4, 2025. <br /> AGREED PRICE=$5,617.81 <br /> 13.To compensate the contractor for procuring an additional set of handles for all musical <br /> Percussion Play equipment. Reference PCO #24.1 dated August 19, 2025. <br /> AGREED PRICE= $625.33 <br /> 14.To compensate the contractor for installing a cane bolt for the library shelter. Reference PCO <br /> #26 dated August 29, 2025. <br /> AGREED PRICE = $450.00 <br /> 15.To compensate the contractor for installing laminate and paint protection film on the library <br /> kiosk. Reference PCO #27 dated September 2, 2025. <br /> AGREED PRICE=$7,549.75 <br /> 16.Credit applied for revised work on the permeable paving located by the mound and boulders. <br /> Reference PCO #25 dated August 29, 2025. <br /> AGREED PRICE=($3,680.00) <br /> TOTAL AGREED PRICE = $101,399.15 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.