My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Adopt Resolution for FY 2021 Emergency Management Performance Grant
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 18 - Adopt Resolution for FY 2021 Emergency Management Performance Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 8:26:35 AM
Creation date
12/18/2024 8:19:33 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
18
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> HSGP Appendix | February 2021 Page A-3 <br />• Responding to an increase in the threat level under the National Terrorism Advisory System <br />(NTAS) or needs resulting from a National Special Security Event <br />• Paying salaries and benefits for personnel to serve as qualified Intelligence Analysts. Per the <br />Personnel Reimbursement for Intelligence Cooperation and Enhancement of Homeland Security <br />Act (PRICE Act), Pub. L. No. 110-412, § 2, codified in relevant part, as amended, at 6 U.S.C. § <br />609(a), SHSP and UASI funds may be used to hire new staff and/or contractor positions to serve <br />as intelligence analysts to enable information/intelligence sharing capabilities, as well as support <br />existing intelligence analysts previously covered by SHSP or UASI funding. See 6 U.S.C. § <br />609(a). To be hired as an intelligence analyst, staff and/or contractor personnel must meet at least <br />one of the following criteria: <br />o Complete training to ensure baseline proficiency in intelligence analysis and production <br />within six months of being hired; and/or, <br />o Previously served as an intelligence analyst for a minimum of two years either in a <br />federal intelligence agency, the military, or state and/or local law enforcement <br />intelligence unit. <br />• All fusion center analytical personnel must demonstrate qualifications that meet or exceed <br />competencies identified in the Common Competencies for state, local, and tribal intelligence <br />analysts, which outlines the minimum categories of training needed for intelligence analysts. A <br />certificate of completion of such training must be on file with the State Administrative Agency <br />(SAA) and must be made available to the recipient’s respective FEMA HQ Preparedness Officer <br />upon request. <br />• Migrating online services to the “.gov” internet domain. <br /> <br />All SAAs are allowed to use up to 50% of their SHSP funding, and all high-risk urban areas are allowed to <br />use up to 50% of their UASI funding, for personnel costs per 6 U.S.C. § 609(b)(2)(A). Personnel hiring, <br />overtime, and backfill expenses are permitted under this grant only to the extent that such expenses are for <br />the allowable activities within the scope of the grant. Personnel expenses may include, but are not limited <br />to training and exercise coordinators, program managers and planners, intelligence analysts, and <br />Statewide Interoperability Coordinators (SWICs). <br /> <br />At the request of a recipient, the FEMA Administrator (or their designee) may grant a waiver of this 50% <br />limitation under 6 U.S.C. § 609(b)(2)(B). Requests for waivers to the personnel cap must be submitted by <br />the authorized representative of the SAA to FEMA in writing on official letterhead, with the following <br />information: <br /> <br />• Documentation explaining why the cap should be waived <br />• Conditions under which the request is being submitted <br />• A budget and method of calculation of personnel costs both in percentages of the grant award <br />and in total dollar amount. <br /> <br />Please see IB 421b for additional information on the waiver request process. <br />Organizational activities under SHSP and UASI include: <br />Operational Overtime Costs. In support of efforts to enhance capabilities for detecting, deterring, <br />disrupting, and preventing acts of terrorism and other catastrophic events, operational overtime costs are <br />allowable for increased protective security measures at critical infrastructure sites or other high-risk <br />locations and to enhance public safety during mass gatherings and high-profile events. In that regard, HSGP <br />recipients are urged to consider using grant funding to support soft target preparedness activities. SHSP or <br />UASI funds may be used to support select operational expenses associated with increased security measures
The URL can be used to link to this page
Your browser does not support the video tag.