Laserfiche WebLink
RJM Design Group I Landscape Architecture <br />Established in 1987, RJM Design Group has RJ MNSIGN <br />GROUP <br />evolved into a multidisciplinary landscape <br />architectural, planning, and design firm committed <br />to serving the needs of cities, public agencies, and organizations <br />throughout California. RJM is comprised of talented professionals, <br />including licensed landscape architects, designers, and <br />planners, most of whom are LEED Accredited Professionals. <br />Services include schematic design, design development, <br />sustainable design solutions, cost analysis, photo -realistic 3D <br />renderings, parks and recreation master planning, custom park <br />standards calculations, funding strategies, program inventory <br />and assessment, operations and maintenance analysis, grant <br />application assistance, design guidelines and standards, <br />community consensus workshops, focus groups, stakeholder <br />interviews, user group questionnaires, ESRI online geo- <br />referenced surveys, multi -modal telephone surveys, construction <br />documents, specifications, bidding services, construction <br />observation, record drawings, on -call design development <br />and review, plan check, and drone aviation (topographic <br />analysis, grading quantity calculations, construction verification, <br />construction progress monitoring, and aerial imagery). <br />Rockwell Construction Services I Electrical, o <br />Instrumentation & Controls Inspection <br />Rockwell Construction Services (RCS) offers • <br />electrical project review, inspection, and general construction <br />management assistance specializing in the water/wastewater <br />industry. Jim Hudson, Jim Harris, Bob Bellon, and Mark Birdsall, <br />of RCS, have over 100 years of combined experience in the <br />design, construction, and start-up and testing of electrical and <br />instrumentation systems for water/wastewater facilities. RCS <br />has worked with Ardurra on the construction management and <br />inspection of many water/wastewater projects. RCS has taken an <br />active role in coordinating with the contractor to properly install the <br />required systems while adhering to industry standards and NEC <br />requirements. <br />d. UNDERSTANDING OF NEED <br />Based on the RFP and conversations with the City, we understand <br />that the City of Santa Ana is seeking qualified firms to provide <br />professional engineering services for planning, design, and <br />construction support for domestic water, recycled water, sanitary <br />sewer, storm sewer, and related facility projects over an initial <br />three-year term with potential for an additional two-year extension. <br />We understand that funding sources may vary for each project, <br />which range from water and sewer main improvements to well <br />rehabilitation, as listed on the City's 7-Year Capital Improvement <br />Program (partial list shown at right). Our team brings extensive <br />experience in these types of projects as well as for the following <br />service categories listed in RFP Attachment 1 Scope of Work: <br />1. Planning, Resources, and Design <br />2. Construction Management <br />3. Pipeline Design <br />4. Electrical, Instrumentation & Control <br />In the team organization chart on page 7, we matched our <br />resources to each element within these four categories. As <br />demonstrated in the next section, we have the experience <br />necessary to respond to the City's needs and efficiently deliver <br />projects in accordance with applicable codes and standards <br />such as Title 24 of the California Code of Regulations (California <br />Building Standards Code), American Water Works Association, <br />California Department of Transportation, Americans with <br />Disabilities Act, and City of Santa Ana Municipal Code. Our <br />team also has the administrative management experience for all <br />funding sources used to support your CIP program. <br />Our goal is to be a true partner with the City, and we share <br />your commitment to maintaining effective operation of <br />the water system and sanitary sewer system; eliminating <br />sewer main obstructions; reducing sewer maintenance <br />requirements; preventing sewer spills; ensuring system <br />reliability; and protecting water quality. <br />APPROACH TO ON -CALL ENGINEERING DESIGN <br />Ardurra has a history of providing services for large on -call <br />contracts to numerous agencies within the region. Because <br />of this experience, our approach to on -call work provides you <br />streamlined delivery, improved communications, and enhanced <br />project outcomes. We adapt this process to meet your needs <br />and your project types. Our proactive management approach <br />FY 2 ; 23 SEIVER 1711PRO)TNJEYrS <br />93. Flower Sueet 5e«rer Matu Lnpra;-ftvents <br />....................................................................................................... <br />99_ :aE Annex septic to seiner Cm version <br />.............................................................................................................. <br />lad. Rene Drive Sen�er Nfata Upgrade <br />............................................................................................................ <br />101. Write Street Sewer Main Iutprotaments <br />............................... .......... ........................... <br />1- ' F iiC, T„ <br />FY 11,23 WATER LNPRO) TME_NTS <br />102. Bristol Street Wate M—un hnproveinenh: Phase 3A - <br />Crac (enter to % ashen toa <br />............................... <br />10_ .East & Vest ResBuildings <br />104. Eudid Street W. arer Main IrnproL is <br />....................................................................................................... <br />105. Fainiew Street 4['ater Main IMxcr eats <br />1 . Iuip meaxeuts......... <br />...................................................................................................... <br />107. NE :Annex STtic to Sewer intpro�-ertaetrts <br />....................................................................................................... <br />108. South _'fain Street TWater Main LRaroventents <br />........................ <br />F-Y !1231FC-NICMU FACU=S <br />109. 'Fell No. 3 2 - Rehabilitation <br />Partial list from the City of Santa Ana's 7-Year <br />Capital Improvement Program (FY2022—FY2028) <br />ARDURRA 10 City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />