RJM Design Group I Landscape Architecture
<br />Established in 1987, RJM Design Group has RJ MNSIGN
<br />GROUP
<br />evolved into a multidisciplinary landscape
<br />architectural, planning, and design firm committed
<br />to serving the needs of cities, public agencies, and organizations
<br />throughout California. RJM is comprised of talented professionals,
<br />including licensed landscape architects, designers, and
<br />planners, most of whom are LEED Accredited Professionals.
<br />Services include schematic design, design development,
<br />sustainable design solutions, cost analysis, photo -realistic 3D
<br />renderings, parks and recreation master planning, custom park
<br />standards calculations, funding strategies, program inventory
<br />and assessment, operations and maintenance analysis, grant
<br />application assistance, design guidelines and standards,
<br />community consensus workshops, focus groups, stakeholder
<br />interviews, user group questionnaires, ESRI online geo-
<br />referenced surveys, multi -modal telephone surveys, construction
<br />documents, specifications, bidding services, construction
<br />observation, record drawings, on -call design development
<br />and review, plan check, and drone aviation (topographic
<br />analysis, grading quantity calculations, construction verification,
<br />construction progress monitoring, and aerial imagery).
<br />Rockwell Construction Services I Electrical, o
<br />Instrumentation & Controls Inspection
<br />Rockwell Construction Services (RCS) offers •
<br />electrical project review, inspection, and general construction
<br />management assistance specializing in the water/wastewater
<br />industry. Jim Hudson, Jim Harris, Bob Bellon, and Mark Birdsall,
<br />of RCS, have over 100 years of combined experience in the
<br />design, construction, and start-up and testing of electrical and
<br />instrumentation systems for water/wastewater facilities. RCS
<br />has worked with Ardurra on the construction management and
<br />inspection of many water/wastewater projects. RCS has taken an
<br />active role in coordinating with the contractor to properly install the
<br />required systems while adhering to industry standards and NEC
<br />requirements.
<br />d. UNDERSTANDING OF NEED
<br />Based on the RFP and conversations with the City, we understand
<br />that the City of Santa Ana is seeking qualified firms to provide
<br />professional engineering services for planning, design, and
<br />construction support for domestic water, recycled water, sanitary
<br />sewer, storm sewer, and related facility projects over an initial
<br />three-year term with potential for an additional two-year extension.
<br />We understand that funding sources may vary for each project,
<br />which range from water and sewer main improvements to well
<br />rehabilitation, as listed on the City's 7-Year Capital Improvement
<br />Program (partial list shown at right). Our team brings extensive
<br />experience in these types of projects as well as for the following
<br />service categories listed in RFP Attachment 1 Scope of Work:
<br />1. Planning, Resources, and Design
<br />2. Construction Management
<br />3. Pipeline Design
<br />4. Electrical, Instrumentation & Control
<br />In the team organization chart on page 7, we matched our
<br />resources to each element within these four categories. As
<br />demonstrated in the next section, we have the experience
<br />necessary to respond to the City's needs and efficiently deliver
<br />projects in accordance with applicable codes and standards
<br />such as Title 24 of the California Code of Regulations (California
<br />Building Standards Code), American Water Works Association,
<br />California Department of Transportation, Americans with
<br />Disabilities Act, and City of Santa Ana Municipal Code. Our
<br />team also has the administrative management experience for all
<br />funding sources used to support your CIP program.
<br />Our goal is to be a true partner with the City, and we share
<br />your commitment to maintaining effective operation of
<br />the water system and sanitary sewer system; eliminating
<br />sewer main obstructions; reducing sewer maintenance
<br />requirements; preventing sewer spills; ensuring system
<br />reliability; and protecting water quality.
<br />APPROACH TO ON -CALL ENGINEERING DESIGN
<br />Ardurra has a history of providing services for large on -call
<br />contracts to numerous agencies within the region. Because
<br />of this experience, our approach to on -call work provides you
<br />streamlined delivery, improved communications, and enhanced
<br />project outcomes. We adapt this process to meet your needs
<br />and your project types. Our proactive management approach
<br />FY 2 ; 23 SEIVER 1711PRO)TNJEYrS
<br />93. Flower Sueet 5e«rer Matu Lnpra;-ftvents
<br />.......................................................................................................
<br />99_ :aE Annex septic to seiner Cm version
<br />..............................................................................................................
<br />lad. Rene Drive Sen�er Nfata Upgrade
<br />............................................................................................................
<br />101. Write Street Sewer Main Iutprotaments
<br />............................... .......... ...........................
<br />1- ' F iiC, T„
<br />FY 11,23 WATER LNPRO) TME_NTS
<br />102. Bristol Street Wate M—un hnproveinenh: Phase 3A -
<br />Crac (enter to % ashen toa
<br />...............................
<br />10_ .East & Vest ResBuildings
<br />104. Eudid Street W. arer Main IrnproL is
<br />.......................................................................................................
<br />105. Fainiew Street 4['ater Main IMxcr eats
<br />1 . Iuip meaxeuts.........
<br />......................................................................................................
<br />107. NE :Annex STtic to Sewer intpro�-ertaetrts
<br />.......................................................................................................
<br />108. South _'fain Street TWater Main LRaroventents
<br />........................
<br />F-Y !1231FC-NICMU FACU=S
<br />109. 'Fell No. 3 2 - Rehabilitation
<br />Partial list from the City of Santa Ana's 7-Year
<br />Capital Improvement Program (FY2022—FY2028)
<br />ARDURRA 10 City of Santa Ana Water Resources Division
<br />RFP 22-002 1 May 24, 2022
<br />
|