Laserfiche WebLink
Safety Improvements at 18 Sites. The project included <br />design services for 18 sites requiring safety upgrades. A <br />PDR was prepared as well as final design services including <br />drawings and specifications. Key components of the project <br />included design of safety handrails, ladder anchor posts, <br />sealed block -self retracting lifeline, fixed ladders, safety <br />guardrails, davit arms, and other safety improvements and <br />retrofits at existing sites. <br />Capital Improvement Projects I City of Anaheim <br />Ardurra provides project r <br />management and construction Categories <br />management services to 2 <br />oversee completion of more <br />than $57 million in capital <br />improvement projects for the <br />City of Anaheim since 2017. <br />Projects and services have <br />included the following: <br />• Fire Station No. 5. Contract <br />administration and CM <br />for $5.4M design -build <br />construction of a 9,400-SF <br />fire station on one acre <br />Client Contact <br />City of Anaheim <br />Jake Hester, Water Engineering <br />& Design Manager <br />714.765.4421 <br />jhester@anaheim.net <br />Year Completed <br />Ongoing since 2017 <br />Consultant Project Managers <br />OmarAlameddine <br />that included parking, <br />driveways, sidewalks, walls, fences, landscaping, water, sewer <br />gas, telephone/cable and electrical utilities, transmissions lines <br />and facilities. Winner of 2018 BEST Award from the APWA <br />Southern California chapter. <br />Indiana Street Water Main Replacement. One of the City's <br />first design -build projects. This design -build project consists <br />of the construction of approximately 2,400 LF of 6-inch ductile <br />iron CL 52 zinc -coated water main, and 200 LF of 8-inch ductile <br />iron CL 52 zinc -coated water main. The project also included <br />the replacement of fire hydrants, valves, water services, and <br />appurtenant structures. <br />Imperial Highway and Big Sky Lane Water Main <br />Replacement. This design -build project consists of the <br />construction of approximately 3,580 LF of 12-inch C909 water <br />main, 1,542 LF of 8-inch C909 water main, and 250 LF of <br />4-inch C909 water main. <br />Santa Ana St. Railroad Water Main Crossing with Metrolink/ <br />SCRRA. This project consists of boring and jacking trenchless <br />installation method, furnishing, and installing approximately 70 <br />LF of 24-inch steel casing pipe welded joints and 12-inch zinc - <br />coated ductile iron pipe class 56 and by open -cut construction <br />method, furnishing and installing approximately 75 LF of 12-inch <br />zinc -coated ductile iron pipe class 52. <br />Citywide Sanitary Sewer Improvement Program/Projects, <br />Group 6. Contract administration and CM for $2M project <br />to build more than 4,200 LF of 24-inch, 1 8-inch, 1 5-inch and <br />10-inch VCP sewer mainline. Included 19 manholes, removing <br />the existing mainline and manholes, rebuilding the street and <br />installing new traffic loops, striping and pavement markers. <br />• La Palma Water Complex — Reservoir Rehabilitation and <br />Pump Station Replacement. Provided contract administration <br />for $9.3M project. Managed demolition of 3-MG reservoir and <br />pump station and rehabilitation of 4-MG reservoir, construction <br />of new pump station, and abandonment of inactive well. <br />• Olive Street 16-inch Water Main Replacement and <br />Roadway Restoration Project. CM for the improvement of <br />water system reliability by replacing old 10- and 6-inch cast <br />iron pipe with new 16-inch ductile iron pipe. The project <br />also included the replacement of fire hydrants, valves, water <br />services, and appurtenant structures. <br />• Lincoln Avenue 16-inch Water Main from Beach Boulevard <br />to Dale Avenue. Contract administration for $2M project to <br />construct more than 5,300 LF of 16-, 12-, 10-, 8-, 6- and 4-inch <br />ductile iron pipe, 12 fire hydrants, and more than 58,500 SF of <br />asphalt concrete paving. <br />• Underground Conversion Plan Projects. Contract <br />administration and CM management for the following projects <br />as part of the City's Underground Conversion Five -Year Plan <br />and Wildfire Mitigation Plan. The initiative is relocating overhead <br />power and communications systems underground and is <br />intended to improve aesthetics, replace antiquated equipment, <br />and enhance the reliability of the area's electrical system. <br />• Rehabilitation of Pressure Regulating Stations (PRS) 30 <br />and 31 and Relocation of PRS-32 and -43 and Construction <br />of New PRS-73. Contract administration and CM services for <br />completion of various on -call water utilities projects. <br />As -Needed Engineering Design Services I Leucadia <br />Wastewater District <br />As a prime consultant, <br />Ardurra provided as -needed Categories <br />engineering services on a task 1, 2, 3 <br />order delivery basis to the Client Contact <br />Leucadia Wastewater District Leucadia Wastewater District <br />staring in 2006. Services <br />Robin Morishita, Technical <br />have encompassed a wide <br />Services Manager <br />variety of tasks to support <br />760.753.0155 x3007 <br />all aspects of the District's <br />rmorishita@lwwd.org <br />capital and operational needs <br />Year Completed <br />including planning and hydraulic <br />Ongoing since 2006 <br />modeling, GIS support services, <br />Consultant Project Managers <br />flow monitoring, engineering <br />Rob Weber <br />design, cost estimating, plan <br />preparation, office engineering <br />during construction, and construction inspection. The following list <br />includes highlights of the several task orders Ardurra completed <br />for the District: <br />ARDURR� 16 City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />