Education
<br />BS/1992/Civil Engineering/Virginia
<br />Polytechnic Institute and State Univ.
<br />Registrations
<br />1999/PE/CA # C59082
<br />20210 CMCI Certified Construction
<br />Manager (A1762)
<br />Certifications
<br />California Stormwater Quality
<br />Association(CASQA) Qualified SWPPP
<br />Developer (QSD) & Qualified SWPPP
<br />Practitioner (QSP) Certification
<br />Amy Czajkowski, PE, CCM, QSD/P
<br />QA/QC & Technical Review, Condition Assessment
<br />In her 29 years of serving water districts, municipalities, and purveyors, Amy Czajkowski, PE, CCM, QSD/P,
<br />has gained recognition for system planning, design engineering, and construction management of public
<br />water and wastewater infrastructure projects. She is recognized for her project management, thorough
<br />design review and plan checking, and ability to work with a variety of contractors and permit applicants.
<br />An additional specialty of hers is stormwater management, which includes design services, assisting with
<br />permitting compliance, and performing inspection for effectiveness of BMP systems during construction.
<br />She has conducted master plans for water and sewer services, assessed impact fees, and developed capital
<br />improvement programs to ensure adequate service. She has managed onsite capital improvement projects
<br />and served as extension of staff acting on behalf of the client.
<br />Amy's engineering design experience includes pump and lift stations, conveyance systems, reservoir
<br />storage, and treatment facilities. Her onsite construction experience, combined with her extensive
<br />research of material and equipment performance allows her to avoid constructability problems and reduce
<br />costs. In addition to being a Certified Construction Manager, Amy is both a certified QSD and QSP giving
<br />her the experience and flexibility to make changes in the field and ensure the project -specific or overall
<br />plans, such as SUSUMPs, HMPs, etc., are effectively implemented. Regardless of the size or complexity
<br />of the project, she focuses on complete and accurate engineering, as well as understanding her clients'
<br />needs.
<br />RELEVANT EXPERIENCE
<br />#24758 (recertification pending) Near -Term Water Supply and CIP, Elsinore Valley Municipal Water District, Lake Elsinore,
<br />Legally Responsible Party (LRP) - CA. Program Manager for more than 40 CIP construction management and design projects ranging in
<br />City of Oceanside construction value from $300,000 to $10 million. The CIP execution rate was over 90% and all projects
<br />Software were completed on time and with an overall 2% change order rate. Responsibilities included project
<br />Primavera P6, Project Management budgeting; preparation of requests for proposals; preparation of reports for internal District committees,
<br />Presentations and the District council; oral presentations at committee, commission, and Council meetings; and
<br />Instructor CCM Course — Contract management of emergency situations.
<br />Administration, CMAA, 2016
<br />Professional Affiliations
<br />Construction Management
<br />Association of America
<br />American Water Works Association
<br />San Diego County Water Works Group
<br />American Council of Engineering
<br />Companies of California
<br />American Society of Civil Engineers,
<br />Pipeline and Environmental Group,
<br />President, 2002-2003
<br />Years of Experience: 29
<br />/V
<br />ARDURRA
<br />Flagler Wells Pipeline Conversion, Elsinore Valley Municipal Water District, Lake Elsinore, CA.
<br />Rehabilitation of 2 groundwater wells (combined yield 1,200 gpm), construction of new pump station,
<br />20-inch steel pipeline, and connection into a 42-inch CMLC.
<br />Engineering Services for the Program/Project Management of Capital Improvement Plan,
<br />Long Beach Water Department (LBWD), Long Beach, CA. Program Manager responsible for
<br />delivering engineering services for the program and project management of the CIP for LBWD. LBWD is
<br />undertaking an aggressive CIP program that ranges from new well water supply projects to sewer pipeline
<br />and lateral replacements. LBWD anticipates a CIP budget for Fiscal Year 2022 of $40 million. This is a large
<br />influx of projects over a short period of time. Ardurra will execute the individual CIP projects and assist in
<br />the overall CIP Program goals.
<br />CIP Management (Construction Management and Design), City of Oceanside, CA. CIP Manager
<br />responsible for the preparation of 15+ in-house designs, RFP preparation, managing consultant contracts,
<br />preparation of Staff Reports and other Council documents, and other functions to complete projects lists
<br />on the FY 15/16 CIP.
<br />City of Santa Ana Water Resources Division
<br />RFP 22-002 1 May 24, 2022
<br />B-3 ] /�/ ARDURRA
<br />
|