Laserfiche WebLink
C BELOW <br />Product Line Items <br />Estimate <br />Job 22-5340 <br />Quote No. Q-13919 <br />Date: 05-16-2022 <br />Expires on: 06-15-2022 <br />Payment Prevailing Wage I Net 30 <br />Product <br />Quantity <br />Sales Price <br />Total Price <br />Admin <br />2 <br />$95.00 <br />$19C.00 <br />Mobilization I Potholing Crew <br />1 <br />$285,00 <br />$285.00 <br />Permitting I No Fee <br />1 <br />$0.00 <br />$0.00 <br />Pothole Report <br />1 <br />$250.00 <br />$250.00 <br />Pothole 15'-10' Deep <br />5 <br />$675.00 <br />$3,375.00 <br />Project Coordinator <br />4 <br />$95.00 <br />$380.00 <br />Traffic Control Plans I Stamped <br />1 <br />$550.00 <br />$550.00 <br />Traffic Control 125--55 MPH <br />1 <br />$1,250.00 <br />$1,250.00 <br />Total USD <br />$6,280.00 <br />Product Descriptions <br />Product Item <br />Description <br />Admin <br />Project Administration. <br />Mobilization I Potholing Crew <br />Mobilization G Potholing Crew <br />Permitting I No Fee <br />Permitting Fee. Subject to Change based on actual agency prices. <br />Pothole Report <br />Pothole Report I Distinctive documented characteristics of utility. <br />Pothole 15'-10' Deep <br />Pothole 1 5'-10' Deep I Includes surface demo, backfill and standard cold <br />patch. <br />Project Coordinator <br />Project Coordinator <br />Traffic Control Plans I Stamped <br />Traffic Control Plans required for City Permit Approval. Stamped by an <br />Engineer. <br />Traffic Control 125-55 MPH <br />Traffic Control 25-55 MPH <br />C Below I SoCal 11-888-90-BELOW I www.cbelow.com I Q-13919 <br />City of Santa Ana Water Resources Division f 9 ,�� DUR R �s <br />RRP 22-002 1 May 24, 2022 L <br />