My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Main Replacement <br />El Monte, CA <br />.......... <br />I I I I I <br />CLIENT CONTACT: City of EI Monte <br />11333 Valley Boulevard <br />El Monte, CA 91731 <br />Lee Torres, City Engineer 1626.580.2055 <br />YEAR COMPLETED: Ongoing <br />KEY PERSONNEL: Joseph Boyle I Maira Salcedo I Michael <br />Swan I Benjamin Halbach I Kimberly <br />Alexander I Dave Moritz <br />SUBCONSULTANTS: GMU <br />Psomas was retained by the City to provide <br />PS&E, surveying, environmental and permitting, <br />community outreach, and construction support <br />services for the replacement of approximately <br />6,900 LF of 4- and 6-inch water mains with <br />8- and 12-inch mains in two areas of the <br />City's distribution system due to their age and <br />to improve fire flow and reliability. Because <br />this is the first phase of a major water main <br />replacement project, the scope also included <br />updating the City's hydraulic model and running <br />various scenarios to determine if the City should <br />standardize on 6- and 10-inch or 8- and 12-inch <br />pipelines for replacement of their aging, smaller <br />diameter mains. This will eliminate the need to <br />stock various different pipe sizes, fittings, valves <br />and appurtenances. <br />Psomas accomplished the scenario modeling, <br />prepared an economic analysis, compared flow <br />and pressure results, and prepared a technical <br />memorandum documenting the analyses and <br />presenting recommendations. After completion <br />of the final design, Psomas will combine plans <br />for sewer improvements in one of the two <br />neighborhoods with the water improvement plans <br />into one bid set so it can be constructed as one <br />coordinated project to limit disruption to residents <br />and business owners. <br />On -Call Engineering Services <br />El Monte, CA <br />CLIENT CONTACT. City of El Monte <br />11333 Valley Boulevard <br />El Monte, CA 91731 <br />Lee Torres, City Engineer 1626.580.2055 <br />YEAR COMPLETED: Ongoing <br />KEY PERSONNEL: Michael Swan I Kimberly Alexander <br />Beginning in 2015, Psomas was retained by the <br />City to update their hydraulic model from a 2010 <br />Water Master Plan and provide on -call modeling <br />services. This update entailed revising demands <br />and supply source data for wells pumping into <br />the system. Following the model update, Psomas <br />has run scenarios for a couple of proposed <br />development projects testing fire flow and <br />developing capital improvement requirements for <br />these new developments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.