My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGISTRATION <br />2011/CA/Professiona I <br />Engineer/Civil/77370 <br />EDUCATION <br />2006/BS/Civil Engineering/ <br />California State University, <br />Fullerton <br />CERTIFICATIONS <br />Envision Sustainability <br />Professional/Institute for <br />Sustainable Infrastructure <br />Maira Salcedo, PE, ENV SP <br />Primary Point of Contact/Senior Project Manager: Water/ <br />Sewer Design <br />Maira Salcedo has 17 years of experience in design of sewer systems, water <br />systems, and report preparation on public works projects throughout Southern <br />California. Her computer experience includes AutoCAD (including Civil3D), <br />ArcView, MS Project, and various spreadsheet and word processing software <br />packages. <br />Experience <br />Bristol Street Water Main Replacement - Santa Ana, CA: Project Engineer <br />for preparation of plans and specifications for replacement of 4,600 LF of <br />16-inch diameter ductile iron pipe that has experienced several leaks and <br />breaks within the past few years due to corrosive soil conditions. Based on <br />recommendations of the corrosivity analysis of the geotechnical report, the <br />design used 16-inch C900 (DR 14) PVC pipe with AWWA C217 wax coating over <br />the ductile iron fittings and valves. The project also included the use of Type V <br />cement in all thrust blocks as the soil was found to be high in sulfates. <br />Pipeline Assessment <br />Orange County Streetcar Project - Santa Ana, CA: Project Engineer for the <br />Certification Program/ <br />design of the water system facility relocations and installations in support of a <br />NASSCO/U-508-7002 <br />four -mile light rail project in the City of Santa Ana. <br />Manhole Assessment <br />Certification Program/ <br />2018 Sewer Rehabilitation Project - Rossmoor, Los Alamitos, CA: Project <br />NASSCO/U-508-7002 <br />Manager for the design of sewer segment rehabilitation in various locations <br />in Rossmoor and the City of Los Alamitos. As District Engineer, Psomas staff <br />EXPERIENCE <br />reviewed 60,000 feet of sewer system CCTV tapes and made appropriate <br />With Psomas for 16 years; <br />recommendations for repairs where needed. The rehabilitation design <br />with other firms for 1 year <br />comprised a combination of CIPP lining of approximately 2,830 feet of 8-inch <br />through 18-inch-diameter sewer in 11 separate locations; UV -Cured Point <br />Repairs (trenchless) at 68 locations; removal and replacement of approximately <br />860 feet of s- and 10-inch-diameter pipe in four areas; and point repairs to <br />8-inch through 18-inch pipe at 14 different locations. Duties included obtaining <br />preliminary encroachment permits from the City of Los Alamitos and the <br />County of Orange, coordination for project advertising, evaluation of the bids <br />received, and recommendation of project award. Construction of the project is <br />anticipated for March 2019. <br />Well 28D Equipping Design - Bellflower, CA: Project Manager for <br />preparation of plans and specifications for new 1,500-GPM, 250-hp vertical <br />turbine well pump equipment, including vertical turbine pump, mechanical <br />piping, bypass valve and air gap connection to storm drain, 600-amp electrical <br />service, 1,120 SF masonry pump, electrical, chemical feed, and SCE meter <br />building designed to blend into residential neighborhood, sodium hypochlorite <br />on -site generation system, sodium fluoride feed system, HVAC, plumbing, and <br />fencing. <br />Well 12C, Liberty Utilities - Compton, CA: Project Manager for preparation <br />of plans and specifications for new 1,500-GPM, 150-hp vertical turbine well <br />
The URL can be used to link to this page
Your browser does not support the video tag.