My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Krista Ka usen, estimates were developed for the agreed upon improvements for each facility and the <br />PE, ENV SP projects were phased over a five-year period. <br />(Continued) Rosecrans Booster Pump Station Replacement Project - Buena Park, CA: <br />Project Engineer for this project, which involved construction of a new pump station <br />at the site of the existing Rosecrans Booster Pump Station in order to serve residents <br />and properties in the upper zones of the Buena Park potable water system. Original <br />pumping capacity was less than 3,500 gallons per minute (gpm), which did not meet <br />peak -hour (3,531 gpm) or maximum -day -plus -fire (5,395 gpm) demands. The newly <br />constructed 1,949-square-foot pump station building includes four separate rooms: <br />pump room, electrical room, generator room, and disinfection room. The project also <br />required grading for vehicle turnaround space, installation of a detention basin, and <br />a surge tank pad. <br />Keith Reservoir - Corona, CA: Project Engineer for preparation of onsite pipelines, <br />valves and mechanical design for a proposed 2.5 MG prestressed concrete reservoir. <br />Design included 16-inch inlet/outlet piping, valve vault, reservoir mixing system, <br />16-inch overflow pipe and 12-inch drain line. Scope of services included preliminary <br />design report, construction plans, specifications and bidding and construction phase <br />engineering. <br />Laguna Sewer Lift Station Rehabilitation - Laguna Beach, CA: Project Engineer <br />for preparation of construction plans and specifications for rehabilitation of the <br />Laguna SOCWA sewer pump station and other improvements. The existing wet well <br />was in a deteriorated condition and required rehabilitation of all interior concrete <br />surfaces and installation of a new PVC liner. Various improvements included sewage <br />bypass plans, site improvements, odor control system, mechanical piping and valve <br />replacements, manholes and sewer pipelines. <br />Hidden Hills Booster Pump Station Final Design - Yorba Linda, CA: Project <br />Engineer for preparation of construction plans and specifications for the Hidden <br />Hills Booster Pump Station Improvements project for Yorba Linda Water District. <br />The project includes the replacement of a small 250-gpm jockey pump, motor, and <br />appurtenances with an 1,800-gpm VFD pump, modifications to existing pump station <br />building including the addition of new electrical room and new roof, and the design <br />of on -site emergency standby Natural Gas engine -generator system. <br />Coto de Caza Life Station Emergency Storage Basin - Coto de Caza, CA: <br />Project Engineer for preparation of a preliminary design study, final design, contract <br />bid documents, and engineering services during construction for the construction of <br />an ESB at the existing Coto de Caza Lift Station. The 45-foot x 38-foot x 25-foot deep <br />cast -in -place reinforced concrete basin is designed to contain sewer overflows from <br />the lift station during emergency events. Project includes coordination of an existing <br />SDG&E power supply line relocation, site improvements to allow tanker truck <br />access to the ESB, including relocation of entrance gate and site walls/fences, and <br />design of overflow and drain pipelines. The ESB is designed to contain three hours <br />of the lift station's average daily flow within three interior chambers. The sewage <br />is transferred among the chambers by two to HP submersible pumps and a series of <br />sluice gates. The design includes electrical and instrumentation improvements to <br />monitor and control the ESB chamber levels. <br />
The URL can be used to link to this page
Your browser does not support the video tag.