Laserfiche WebLink
Below is our organization chart and a table summarizing our Project Team's education and years of <br />experience may be found following this page. We have included resumes for the noted personnel in the <br />Appendix. <br />PW AND RW PIPELINE <br />REPLACEMENT/ EXTENSION <br />TASK ENGINEER <br />Ericalenkins <br />DESIGN ENGINEER <br />Kyle Bohn, PE <br />TASK MANAGER <br />Victor Ramirez, PE, SE <br />DESIGN ENGINEER <br />Eric Yuen, PE, SE <br />PROJECT TEAM CHART <br />t <br />CITY OF SANTA ANA PUBLIC WORKS AGENCY <br />,# PROJECT DIRECTOR/MANAGER <br />Tom Epperson, <br />OA/QC <br />N Mark Bush, PE <br />DEPUTY PROJECT MANAGER <br />r <br />TASK ENGINEER <br />Laurence Esguerra, PE <br />DESIGN ENGINEER <br />Matt Vera, PE <br />TASK MANAGER <br />Molly Mell, PE <br />DESIGN ENGINEER <br />Molly Lovegren, PE <br />Luke Ramirez, PE Nate Schreiner, PE, <br />QSD <br />HYDROGEOLOGY <br />Richard C. Slade & Associates <br />PUMP/LIFT STATION WATER OLIALITY/ <br />UPGRADE$DISINFECTION <br />TASK ENGINEER TASK MANAGER <br />Mike Tsoi, PE Amanda Taylor, PE <br />DESIGN ENGINEER DESIGN ENGINEER <br />Erin Cabanero, PE Beverly Encina, PE <br />TASK MANAGER TASK MANAGER <br />Mazen Kassar, PE Ken Berard, PE <br />TASK ENGINEER TASK ENGINEER <br />Douglas Seaman, PE Adrian Lee, PE <br />ENVIRONMENTAL TRAFFIC CONTROL <br />Cory Heggtveit, EIT Paula Fell Peter Kim, PE, TE <br />DESIGN SURVEY/MAPPING GEOTECHNICAL INVESTIGATION <br />Metz Surveying Leighton Consulting, Inc. <br />TETRA TECH Page 16 <br />