My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 14 <br />REFERENCES <br />A true indicator of our abilities lies in our <br />industry -wide reputation. We have been long <br />regarded as a premium engineering firm <br />providing clear solutions to complex <br />challenges. Accordingly, we urge you to contact <br />our references to inquire first-hand knowledge <br />Irvine Ranch Water District <br />15600 Sand Canyon Avenue <br />Irvine, CA 92618 <br />Richard Mori, PE <br />949/453-5571 <br />mori@irwd.com <br />8 Pipelines; 6 Pump Stations; <br />12 Well Equipping; 1 Reservoir; and <br />4 Membrane Treatment Projects <br />El Toro Water District <br />24251 Los Alisos Blvd. <br />Lake Forest, CA 92630 <br />Dennis Cafferty, PE <br />949/837-7050 <br />dcafferty@etwd.com <br />Recycled Water Distribution System <br />Expansion; and Oso Lift Station <br />Improvements <br />City of Paramount <br />16400 Colorado Avenue <br />Paramount, CA 90723 <br />Adriana Figueroa <br />562/220-2100 <br />AFigueroa@paramountcity.com <br />As -Needed Services; 4 Well <br />Equipping/Disinfection; Pipeline Upgrade; <br />and 4 Reports including a Water <br />Master Plan <br />about our past work. In addition to our <br />successfully completed projects for the City, we <br />offer the references provided below. Each are <br />familiar with the wide range of services we <br />provide, and the key personnel on our team. <br />Moulton Niguel Water District <br />27500 La Paz Road <br />Laguna Niguel, CA 92677 <br />Matt Collings, PE <br />949/425-3552 <br />mcolling@mnwd.com <br />On -Call Services; 8 pipelines; 4 Meter <br />Projects; 6 Pump Station/1 Lift Station <br />Upgrades; 4 Studies; and 2 Reports <br />Orange County Water District <br />18700 Ward Street <br />Fountain Valley, CA 92708 <br />Mike Markus, PE <br />714/378-3305 <br />mmarkus@ocwd.com <br />6 Pipelines; 1 Vault Modification; <br />1 Pump Station; and 1 Well Injection Project <br />Mesa Water District <br />1965 Placentia Avenue <br />Costa Mesa, CA 92627 <br />Andrew Wiesner, PE <br />949/207-5458 <br />andreww@mesawater.org <br />On -Call Services; 2 Well Projects; 4 Pipeline <br />Projects; Valve Replacements; Standard <br />Upgrades; and 4 Water/Wastewater Projects <br />TETRA TECH Page 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.