My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laurence Esguerra, PE Education: <br />Sewer Main Relining/Rehabilitation 2004 Irvine, <br />Mr. Esguerra has more than 19 years of experience in water and <br />wastewater specializing in the design of over 75 miles of potable water, Registrations/Certifications: <br />recycled water and sewer pipelines, 5 pump stations, 5 production <br />Professional Civil Engineer, <br />wells, 2 lift stations, reinforced concrete and steel reservoirs, flow <br />California, No. 73803, 2009 <br />control facilities, and pressure reducing valve vaults. Along with his <br />Professional Affiliations: <br />extensive technical skills in water/wastewater Mr. Esguerra is <br />American Society of Civil <br />experienced in project management by leading multi -disciplinary <br />Engineers, Orange County <br />projects trough preliminary design, final design and construction. <br />orange County water <br />EXPERIENCE <br />Association <br />Office Location: <br />Diemer Pipeline Emergency Repair, Moulton Niguel Water District, Irvine, CA <br />Aliso Viejo, CA. 2017. Project Engineer. Provided plans and <br />construction phase services for approximately 200 feet of existing Years of Experience: <br />36-inch CML&C steel pipe. The relocated pipe was relocated above 19 <br />ground and spans an existing drainage channel with about six to Years with Tetra Tech: <br />several feet of clearance (from the bottom of the channel). Concrete 19 <br />thrust blocks, encasements were required on the vertical riser at both <br />ends of the relocation to handle the corresponding thrust. The above ground pipe was incased within a <br />steel casing for added security. <br />Pipeline from Baker Pump Station to OC-76, El Toro Water District, Lake Forest, CA. 2017. <br />Project Engineer. Design of 5,100 feet of pipeline to minimize the pressure increase within the R-6 <br />Pressure Zone as a result of the Baker Pump Station. <br />Carlsbad Seawater Desalination Conveyance Pipeline, KSD Joint Venture, Carlsbad, CA. 2015. <br />Design Engineer. Engineering design for the Carlsbad Conveyance Pipeline Design -Build Project. The <br />project was designed for the Kiewit Shea Desalination Joint Venture team and consists of <br />approximately 10 miles of 54-inch welded steel pipe. The pipeline was installed in existing city streets <br />and right-of-way through the cities of Carlsbad, Vista, and San Marcos. Large diameter tunnels are <br />being used to cross a major commuter rail line, an Interstate Highway, and protected wetlands at the <br />entrance to a seawater lagoon. The 54-inch transmission main is sized for 54 million gallons per day of <br />desalinated seawater. Pressures range from 250 psi at the point of connection to 500 psi at the <br />seawater desalination plant. <br />Sand Canyon Grade Separation, Irvine Ranch Water District, Irvine, CA. 2010. Design Engineer. <br />Design services for the relocation of over 5,000 linear feet of 8- to 24-inch potable pipeline in the City of <br />Irvine as part of the Roadway Grade Separation for the Railroad. The project also included the design <br />of 2,000 feet of 16-inch recycled waterline. <br />Ohio Street and Oriente Drive Pipeline Replacement, Yorba Linda Water District, Yorba Linda, <br />CA. 2010. Design Engineer. Design improvements for approximately 3,000 feet of 16-inch ductile iron <br />and 1,000 feet of PVC water main to replace existing cast iron water mains within the City of Yorba <br />Linda. The project included the replacement of existing water services, fire hydrants and the up -sizing <br />of the existing main. <br />Sand Canyon Grade Separation, Irvine Ranch Water District, Irvine, CA. 2010. Design Engineer. <br />Design services for the relocation of over 5,000 linear feet of 8- to 24-inch potable pipeline in the City of <br />Irvine as part of the Roadway Grade Separation for the Railroad. The project also included the design <br />of 2,000 feet of 16-inch recycled waterline. <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.