My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve Appropriation Adjustments, Reallocation of Funds, and Award a Construction Contract for Traffic Signal Modification Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 17 - Approve Appropriation Adjustments, Reallocation of Funds, and Award a Construction Contract for Traffic Signal Modification Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:42:38 AM
Creation date
12/18/2024 8:25:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />1st Street/Jackson and 5th <br />Street/Euclid Signal Modifications <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Safety / Mobility <br />LOCATION MAP A <br />N <br />- <br />f <br />i <br />{ <br />4, a <br />Syr <br />,� <br />KPH <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Design and installation of left turn arrows at 1st StreetQackson <br />Street and 5th Street/Euclid Street. <br />PROJECT NEED: <br />This project designed to enhance traffic safety. <br />EXHIBIT 3 <br />8 is <br />Total <br />Project <br />PROJECT COSTS Cost FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 929,759 333,359 - - - - - - <br />Engineering 129,800 - <br />TOTAL 1,059,559 333,359 <br />Total <br />Project <br />SOURCE OF FUNDS Cost FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 <br />213,959 213,959 - - - - <br />H S I P 845,600 119,400 <br />TOTAL 1,059,559 333,359 - - <br />DIVISION: <br />Traffic Engineering <br />CONTACT: <br />Zdenek Kekula, Principal Civil Engineer <br />FY 27/28 FY 28/29 <br />DATE: <br />04-Aug-2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.