My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve Appropriation Adjustments, Reallocation of Funds, and Award a Construction Contract for Traffic Signal Modification Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 17 - Approve Appropriation Adjustments, Reallocation of Funds, and Award a Construction Contract for Traffic Signal Modification Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:42:38 AM
Creation date
12/18/2024 8:25:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA RE -BID <br />PROPOSAL <br />PROJECT NO.: 18-6919 <br />1 ST ST AT JACKSON ST & 5TH ST AT EUCLID ST TRAFFIC SIGNAL MODIFICATION <br />FEDERAL PROJECT NO: HSIPL 5063 (190) <br />Item <br />Description <br />Unit <br />Unit Price <br />Amount <br />8 <br />Install 4" PVC Conduit Per Plan <br />530 <br />LF <br />$ <br />6-7 77U <br />9 <br />Install No. 6 Pullbox <br />26 <br />EA <br />$ 8Z 7 — <br />$ <br />10 <br />Install No. 6E Pullbox <br />3 <br />EA <br />$ // / 03 ~ <br />$ 3� Q <br />1 I <br />Install SCE Pull Box <br />1 <br />EA <br />S Zc)7z ` <br />$ 2c U 7q <br />12 <br />Install 120 Strand SMFO Cable <br />1600 <br />LF <br />$ o — <br />$ <br />13 <br />Fusion Splice 1 Strand SMFO <br />24 <br />EA <br />$ <br />14 <br />Install IP Communication System at <br />1 st St and Jackson St <br />1 <br />LS <br />$ <br />15 <br />Pothole Pole Locations for Utility <br />Conflicts <br />9 <br />EA <br />S <br />$ /0 36-7 J <br />/ <br />16 <br />Pothole Utilities not Shown on Plan <br />5 <br />EA <br />S /, /�v — <br />$ 5— �caU <br />1 7 <br />Temporary Overhead Wiring at l st St <br />and Jackson St <br />I <br />LS <br />$17.,%Z1" <br />$ 171 q ZS . <br />18 <br />Temporary Overhead Wiring at 5th <br />St and Euclid St <br />I <br />LS <br />$ �r 3 j f <br />$, <br />19 <br />Unclassified Excavation <br />25 <br />CY <br />$ �� 3� <br />$ 2�� 35Z <br />20 <br />Construct ADA Wheel Chair Ramp <br />Per City of Santa Ana Std. Plan No. <br />1122. <br />2250 <br />SF <br />$22. <br />$ 3110 <br />P-2 of P-52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.