My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Resolution rescinding Resolution No. 94-031
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 28 - Resolution rescinding Resolution No. 94-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:37:25 PM
Creation date
1/15/2025 1:26:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
28
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-031 <br />EXHIBIT <br />ao <br />Co <br />GENERAL <br />1. <br />2. <br />3. <br />4. <br />EXHIBIT B <br />Construct sewer facilities per approved plans. <br />Construct water facilities per approved plans. <br />Construct storm drain facilities per approved plans. <br />Install signing and striping per approved plans. <br />IMPROVE ALL PUBLIC FRONTING STREETS AS FOLLOWS: <br />5. Furnish ornamental street lighting with <br />directed by the City Engineer. <br />underground service <br />6. Close all unused driveways with curb, gutter, and sidewalk <br />approved improvement plans. <br />Remove and replace all uplifted and cracked sidewalk. <br />as <br />per <br />Construct street tree wells and plant minimum 24 inch box trees per <br />City Standard No. 1124 at locations in accordance with approved <br />improvement plans. <br />9. Construct sidewalk per approved improvement plans. <br />IMPROVE HESPERIAN STREET AS FOLLOWS: <br />Construct a cul-de-sac at the proposed terminus of Hesperian Street <br />as approved by the Public Works Agency per City standard No. 1106. <br />10. <br />11. Construct driveways per approved improvement plans. <br />IMPROVE CUBBON STREET AS FOLLOWS: <br />12. Construct driveway per approved improvement plans. <br />13. Construct off-site student drop-off zone with curb, gutter, <br />pavement, and sidewalk to close Cubb0n Street. <br />IMPROVE BRISTOL STREET AS FOLLOWS: <br />14. Construct driveways per approved improvement plans. <br />15. Close unused drive approaches with curb, gutter and sidewalk and <br />reconstruct X-portion of the existing drive approach of the <br />southerly property. <br />16. Improve Graham Lane by constructing driveways per approved improve- <br />ment plans. <br />17. Improve the alley from the proposed Hesperian Street cul-de-sac to <br />the alley east of Hesperian Street by constructing a Portland Cement <br />Concrete (P.C.C.) alley per City Standard No. 1111.
The URL can be used to link to this page
Your browser does not support the video tag.