My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Bubalo Construction Storm Drain Job History <br />00-1 Kendall Drive Storm Drain <br />$105,000.00 <br />Owner: <br />City of San Gabriel <br />425 S. Mission Drive <br />San Gabriel, CA 91778-0130 <br />(626) 308-2800 <br />Engineer., <br />Norris-Repke, Inc., <br />600 N. Tustin Avenue, Suite 250, <br />Santa Ana, CA 92705-3736 <br />(714)973-2230 <br />Description: <br />500 feet of 36", 24" & 18" RCP Storm Drain and appurtenant structures <br />Date Completed: <br />8/00 <br />Percent Completed: <br />100% <br />Contact.• <br />Douglas Benash, P.E., Senior Civil Engineer <br />(626)308-2800 <br />00-5 Project 9037 Unit 2 Storm Drain <br />$117,720.00 <br />Owner and Engineer. <br />Los Angeles County Department of Public Works Contract <br />Description: <br />815 feet of 24" RCP Storm Drain <br />Date Completed: <br />7/00 <br />Percent Completed., <br />100% <br />Subcontract For.• <br />Andrew Papac & Sons <br />
The URL can be used to link to this page
Your browser does not support the video tag.