My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAVID D. SOREM, P.E. <br />EDUCATION <br />University of Southern California, Los Angeles, CA <br />8/84 to 5/85, graduate courses, Advanced Steel and Concrete Design <br />California State University of Los Angeles, Los Angeles, CA <br />4/83 to 12/83, graduate courses, Engineering Application of Computers and Advance Structural <br />Analysis. <br />North Dakota State University, Fargo, ND <br />Bachelor of Science, Civil Engineering, 11/81 <br />Moorhead State University, Moorhead, MN <br />Pre -engineering, 8/77 to 8/80 <br />EXPERIENCE <br />Mike Bubalo Construction Co., Inc. <br />1/00 to present Manager and Partner of Mike Bubalo Construction Co., Inc. <br />Responsibilities include management, estimating, engineering and general <br />operation of the corporation. <br />Steve Bubalo Construction Co., Inc. <br />6/92 to 12/99 Project Manager <br />Responsibilities include staff support and estimating for the construction of <br />sewers, storm drains and water lines. <br />Los Angeles County Department of Public Works (formerly Los Angeles County Flood Control <br />District), Alhambra, CA <br />4/89 to 6/92 Section Head — Design Division, Contracting Section <br />Responsibilities include the supervision of engineering staff for the preparation of <br />plans and specifications for Public Works projects, the review and selection of <br />consultants and negotiating contracts for their engineering services. Additional <br />responsibilities include providing technical assistance to County Counsel and the <br />presentation of projects to County Administration and other agencies. Total <br />construction dollar amount - $90 million. <br />4/88 to 4/89 Unit Head — Design Division, Contracting Unit <br />Same responsibilities listed above as Section Head. Total construction dollar <br />amount - $20 million. <br />8/87 to 4/88 Project Engineer — Design Division, Technical Support section <br />Act as the Department's Project Engineer/Manager for the planning and design <br />of drainage and roadway projects. Encompasses instructing and advising <br />Consultants that prepare construction drawings for the Department, Processing <br />
The URL can be used to link to this page
Your browser does not support the video tag.