My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 17 - Approve an Appropriation Adjustment and Award a Construction Contract tfor Street Flood Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 5:21:15 PM
Creation date
1/21/2025 2:13:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6627 <br />ROUSSELLE STREET FLOOD PROTECTION PROJECT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: MIKE BUBALO CONSTRUCTION CO,, INC. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all. material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or hump sums) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Shoring of Open Excavations <br />1 <br />LS <br />$200,000.00 <br />$ 200,000,00 <br />2 <br />Dewatering <br />1 <br />LS <br />$ 3o,onaoo <br />$ 30,000.00 <br />3 <br />As -Built Plans <br />1 <br />LS <br />$5,000 <br />$5,000 <br />4 <br />Clearing and Grubbing <br />1 <br />LS <br />$ 55,000.00 <br />$ 55, 000.00 <br />5 <br />Unclassified Excavation <br />526 <br />CY <br />$400.00 <br />$ 210,400.00 <br />6 <br />Asphalt Concrete (ARHM:) <br />488 <br />TON <br />$ 215.00 <br />$ 104,920.00 <br />7 <br />Asphalt Concrete (HMA) <br />406 <br />TON <br />$ 250.00 <br />$ 101,500.00 <br />8 <br />CMB or Class 11 Base <br />300 <br />CY <br />$150 00 <br />$ 45,000.00 <br />9 <br />Cold Mi Iling (2" Max) <br />23,270 <br />SF <br />$ 3.00 <br />$ 69,810.00 <br />to <br />Curb and Gutter per C.S.A. Std. 1101, <br />A-2-6 <br />690 <br />LF <br />$100.00 <br />$ 69,000.00 <br />11 <br />Curb, Type A-2-6 (Modified) per Sheet <br />DA-02 <br />60 <br />LF <br />$100.00 <br />$ 6,000.00 <br />12 <br />6' Wide Bike Lane (Modified Type A-2- <br />31.0 <br />SF <br />8 <br />$ 31,000.00 <br />13 <br />Curb and Gutter per SPPWC Std. 120-3, <br />A3-6 <br />1,080 <br />LF <br />$ 50.00 <br />$ 54,000.00 <br />14 <br />PCC Sidewalk per C.S.A. Std. 1104 <br />690 <br />SF <br />$25.00 <br />$ 17,250.00 <br />15 <br />Fire Access Path, 8" PCC Over <br />Compacted Subgrade, Transition <br />Adjacent Curbs to 3" TTigh <br />307 <br />SF <br />$ <br />30.00 <br />$ <br />9,210.00 <br />16 <br />Curb Ramp per Caitrans Std. A88A, <br />Case A <br />640 <br />SF <br />$ 50.00 <br />$ 32, 000.00 <br />R-1 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.