Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6627 <br />ROUSSH.I.E STREVT FLOOD PROTECTION CTION 111W.11=C1 <br />Item <br />Description <br />Qtv <br />Unit <br />Unit Price <br />Amount <br />40 <br />8" Class 350 Ductile Iron %% ater plain <br />Vertical Offset Per C'.S.,\. Sid. 1413A <br />with Adapters per C.S.A. Sid. 144, <br />80 <br />LF <br />S <br />600.00 <br />S <br />48,000.00 <br />41 <br />Signing and Striping(Includes Remmal <br />ot�F,xistim, Striping.Pa\ement <br />Markings) <br />I <br />LS <br />S <br />20.000.00 <br />S <br />20,000.00 <br />42 <br />Additional Potholing(As-Needed)"` <br />5 <br />EA <br />S5,000.00 <br />S25,000.00 <br />- <br />t3 <br />Tree Removal and Replacement (As- <br />Needed)" <br />7 <br />F:\ <br />S5,000.00 <br />— <br />'35,000.00 <br />-u <br />Root Slim ing(As-Needed)` <br />15 <br />EA <br />S700.00 <br />S10,500.00 <br />44; <br />90-Dad Landscape Establishment <br />I <br />LS <br />S$ 000.00 <br />S$ 000.00 <br />46 <br />Construction Permit <br />I <br />LS <br />S17.669 <br />S17.669 <br />Biel Alternates <br />47 <br />Add -Alt Landscaping <br />I <br />I.S S 55,000.00 ` 55,000.00 <br />TOTAL BASE BID S4,058,259.00 <br />TOTAL ADD ALTERNATE BID I S4,113,259.00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />riollt to award the Base Bid. and any, all. or none of the add -alternate bid items (ifany). <br />The quantity for this bid item is shown Im bid comparison only. This hid item shall not be <br />subject to the " 25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount fur this item \\ ill be dictated b\ the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordinuk <br />This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIN -IL FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATLD DAMAGES <br />]'he Undersigned bidder hereb: proposes to complete the VVorlc for the total base bid amount <br />shows above. \%ithin 200 ,ovorklna.days after tile commencement date stated in the Notice to <br />Proceed. Upon issuance of the Notice to Proceed. Contractor shall immediately place order tur <br />lone -lead time items (i.e. Reinforced C'oncrcte Box storm drain. Filterra Units. etc.) in <br />accordance m ith grant funding requirements. Wort: shall be completed by December 3 I. 2025. <br />Refer to the Grant Agreement included in Appendix K. <br />The liquidated damagcs amount. in lieu of the anlOUllt specified ill SUhSeCUon 6-9 of till' <br />Standard Specifications, shall he $3,750 per calendar clay. <br />P-3 of P-20 <br />