Laserfiche WebLink
EXHIBIT 7 <br />PROJECT TITLE: <br />Rousselle Street Flood Protection <br />Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Design and construction of the Rousselle Street Flood Protection Project. <br />This project features the upgrade of existing City stormdrain on Rousselle <br />Street, from Warner Avenue to St Gertrude Place, and was identified in the <br />City's 2018 Storm Drain Master Plan as one of the top 10 recommended <br />capital projects. <br />PROJECT COSTS <br />Construction <br />PROJECT NEED: <br />The City experiences significant flooding during intense rain events, which <br />has negative impacts on vehicles and pedestrian travel, business operations, <br />and causes property damage. The project will increase the capacity of the <br />City's stormdrain system to reduce flooding and also includes stormwater <br />treatment devices. <br />FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />831,000 - - - - - - <br />TOTAL 831,000 <br />SOURCE OF FUNDS <br />FED CLEAN WATER <br />TOTAL <br />DIVISION: <br />Construction Engineering <br />FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />831,000 - - - - - - <br />831,000 <br />CONTACT: <br />Craig Foster, NPDES Manager <br />DATE: <br />21-Jan-2025 <br />