Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6627 <br />ROUSSELLE STREET FLOOD PROTECTION PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />40 <br />8" Class 350 Ductile Iron Water Main <br />Vertical Offset Per C.S.A. Std. 1413A <br />with Adapters per C.S.A. Std. 1443 <br />80 <br />LF <br />$ <br />600.00 <br />$ <br />48,000.00 <br />41 <br />Signing and Striping (Includes Removal <br />of Existing Striping/Pavement <br />Markings) <br />1 <br />LS <br />$ <br />20,000.00 <br />S <br />20,000.00 <br />42 <br />Additional Potholing (As -Needed)' <br />5 <br />EA <br />$5,000.00 <br />S 25,000.00 <br />43 <br />Tree Removal and Replacement (As - <br />Needed)* <br />7 <br />EA <br />$ 5,000.00 <br />$ 35,000.00 <br />44 <br />Root Shaving (As -Needed)* <br />15 <br />EA <br />$ 700.00 <br />110,500.00 <br />45 <br />90-Day Landscape Establishment <br />1 <br />LS <br />$ 8 000.00 <br />$ 8,000.00 <br />46 <br />Construction Permit <br />1 <br />LS <br />$17,669 <br />$17,669 <br />Bid Alternates <br />47 <br />Add -Alt Landscaping <br />l <br />L.S <br />S55,000.00 <br />55,000.00 <br />TOTAL BASE BID $ 4,058,259.00 <br />TOTAL ADD ALTERNATE BID $4 113,259.00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />I This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 200 working days after the commencement date stated in the Notice to <br />Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for <br />long -lead time items (i.e. Reinforced Concrete Box storm drain, Filterra Units, etc.) in <br />accordance with grant funding requirements. Work shall be completed by December 31, 2025. <br />Refer to the Grant Agreement included in Appendix K. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $3,750 per calendar day. <br />P-3 of P-20 <br />