My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Appropriation Adjustment and Agreement for MacArthur Street Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 19 - Appropriation Adjustment and Agreement for MacArthur Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 10:48:22 AM
Creation date
1/21/2025 2:14:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT 2 <br />COOPERATIVE COST REIMBURSEMENT AGREEMENT <br />FOR CRODDY WAY STREET IMPROVEMENTS PROJECT <br />COOPERATIVE COST REIMBURSEMENT AGREEMENT ("Agreement"), is made and <br />entered into this ____ day of ____________, 2024, by and between the CITY OF SANTA <br />ANA, a California charter city (“Santa Ana" or “City”), and the MESA WATER DISTRICT, <br />a county water district organized and existing pursuant to the laws of the State of <br />California ("Mesa Water"). In this Agreement, Santa Ana and Mesa Water may each be <br />individually referred to as a "Party" and collectively referred to as the "Parties." <br />RECITALS: <br />WHEREAS, on August 12, 2021, Mesa Water was issued Permit No. S0104786 <br />(“2021 Permit”) to construct a water transmission pipeline, and related facilities, to <br />transmit water from Mesa Water’s two new groundwater wells located along Croddy Way <br />within the City; and <br />WHEREAS, the 2021 Permit required Mesa Water to restore the affected street(s) <br />with a simple trench cut patch pursuant to City standard plans, which generally results in <br />new pavement that is two feet wider than the trench followed by a thin curb to curb grind <br />and overlay; and <br />WHEREAS, due to the existing pavement condition and construction activities, <br />Mesa Water has agreed to expand its street surface restoration to include a full depth <br />street replacement from curb to curb on Croddy Way between Garry Avenue and <br />MacArthur Boulevard, the full depth replacement of the eastern half of Croddy Way <br />between Chandler Avenue and Garry Avenue, and the northerly half of Chandler between <br />the western boundary of 4011 W Chandler Avenue and Croddy (APN 415-014-03) in the <br />City of Santa Ana (collectively, the “Mesa Water® Scope”); and <br />WHEREAS, Santa Ana has additional areas requiring full depth street replacement <br />of the western half of Croddy Way between Chandler Avenue and Garry Avenue and the <br />southerly half of Chandler between the western boundary of 4011 W Chandler Avenue <br />and Croddy (APN 415-014-03) in the City of Santa Ana (collectively, the “Santa Ana <br />Scope”); and <br />WHEREAS, in an effort to efficiently utilize Mesa Water’s resources, Mesa Water <br />and Santa Ana desire to enter a cooperative agreement and share in the costs of the <br />street improvements incorporating both the Mesa Water® Scope and the Santa Ana <br />Scope (collectively, the “Project”); and <br />WHEREAS, the scope of work of the Project includes excavation, grading, removal <br />and replacement of asphalt concrete pavement and Portland cement concrete, and <br />signing and striping; and
The URL can be used to link to this page
Your browser does not support the video tag.