| O RAIIV 
<br />O �r 
<br />GENERAL NOTES 
<br />1. ALL WORK SHOWN HEREON SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROVISIONS OF THE AGC/APWA 
<br />STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (CURRENT EDITION) AND SUPPLEMENTAL STANDARD 
<br />PROVISIONS ISSUED BY AND FOR USE IN THE CITY OF SANTA ANA. 
<br />2. CONTRACTOR SHALL COMPLY WITH STANDARD PLAN NO. 1160. REFER TO 
<br />https: //www.santo-ano.org/sites/default/files/Documents/1160-st.pdf. COPIES ARE AVAILABLE AT THE PUBLIC 
<br />WORKS COUNTER. 
<br />3. WITHIN 72-HOURS AFTER FINAL SURFACING IS PLACED, ALL MANHOLE AND VALVE BOX FRAMES AND COVERS SHALL 
<br />BE ADJUSTED BY THE DEVELOPER TO FINISH GRADE. THIS IS TO BE DONE PRIOR TO PLACING SEAL COAT. 
<br />4. WHEN CONSTRUCTION OF ASPHALT CONCRETE (AC) PAVEMENT INCLUDES REPLACEMENT OF PAVEMENT OVER 
<br />TRENCHES, PATCHES OR CUTS OR AN AC OVERLAY, PAVEMENT SHALL BE COVERED WITH PENETRATION TYPE 
<br />ASPHALT EMULSION (0.07 GALLONS PER SQUARE YARD) AFTER STREET PAVEMENT HAS BEEN CLEANED. FOG SEAL 
<br />COAT IS NOT REQUIRED FOR CONSTRUCTION OF NEW STREETS OR WIDENING OF EXISTING STREETS. 
<br />5. FEATHER AC WHERE MEETING EXISTING PAVEMENT. FEATHER TO LANE LINE OR A MINIMUM OF 10 FEET OR AS 
<br />DIRECTED BY THE CITY ENGINEER. 
<br />6. THE ENGINEER FOR THE SUBDIVIDER SHALL PROVIDE HUBS IN THE STREET FOR FINISHED SUBGRADE AND FINISHED 
<br />GRADE AT THE CROWN, AT ALL POINTS WHERE ELEVATIONS ARE SHOWN ON THE PLANS AND AT ANY ADDITIONAL 
<br />POINTS REQUIRED BY THE CITY ENGINEER. 
<br />7. AT THE TIME OF COMPACTING THE BASE SOIL AND PREPARING SUBGRADE, IF THE MOISTURE CONTENT IS SUCH THAT 
<br />THE SPECIFIED RELATIVE COMPACTION CANNOT BE OBTAINED OR THE SUBGRADE IS YIELDING, THE FOLLOWING 
<br />REMEDIAL ACTION SHALL BE PROVIDED: 
<br />A. REMOVE EXCESS MOISTURE BY SCARIFYING AND AERATING, OR 
<br />B. EXCAVATE UNSTABLE AREAS AND BACKFILL WITH SUITABLE MATERIAL OR BASE, OR 
<br />C. INCREASE THE AGGREGATE BASE SECTION, OR 
<br />D. STABILIZE THE BASEMENT SOIL WITH SUITABLE ADDITIVES, OR 
<br />E. PROVIDE AN ALTERNATE METHOD SUITABLE TO THE CITY ENGINEER. 
<br />8. WATER MAINS AND SERVICES ARE TO BE INSTALLED BY THE DEVELOPER AFTER THE CURB AND GUTTER IS 
<br />CONSTRUCTED AND BEFORE THE BASE UNDER THE AC SURFACING IS LAID. CONTACT WATER DIVISION SUPERVISOR AT 
<br />(714) 647-3343 TO ARRANGE SCHEDULING FOR WATER SYSTEM WORK BY THE CITY. 
<br />9. THE SUBDIVIDER SHALL RELOCATE ANY EXISTING PUBLIC UTILITIES LOCATED IN A DEDICATED RIGHT-OF-WAY, AS 
<br />REQUIRED BY THE CITY. 
<br />10. PERMIT NOTE - NO PERMIT WILL BE ISSUED FOR INSTALLATION OF UNDERGROUND UTILITY LINES UNTIL SAID UTILITY 
<br />LINES ARE SHOWN ON THE STREET IMPROVEMENT PLANS AND THEIR LOCATIONS ARE CERTIFIED BY THE PRIVATE 
<br />ENGINEER AND APPROVED BY THE CITY. 
<br />11. VCP SEWER CONNECTIONS ARE TO BE CONSTRUCTED FROM SEWER MAINS TO THE PROPERTY LINE. THE DEVELOPER IS 
<br />TO FURNISH THE CITY WITH THE LOCATION OF EACH CONNECTION. ALL SEWER LATERALS ARE TO BE REFERENCED ON 
<br />CURB. 
<br />12. ALL VCP JOINTS SHALL BE PLASTIC MECHANICAL COMPRESSION JOINTS OR BANDSEALS. 
<br />13. IT SHALL BE THE RESPONSIBILITY OF THE SEWER CONTRACTOR TO EXPOSE ALL JOIN POINTS TO THE EXISTING SEWER 
<br />AND TO HAVE THE LOCATION AND ELEVATION VERIFIED PRIOR TO ANY SEWER STAKES BEING FURNISHED. 
<br />14. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE ALL FLOW LINE ELEVATIONS AT ALL SEWER 
<br />MANHOLES VERIFIED PRIOR TO ANY PIPE BACKFILL. "AS BUILT" FLOW LINE ELEVATIONS ARE TO BE SUBMITTED TO 
<br />THE CITY PRIOR TO ANY PAVING. 
<br />15. CALL UNDERGROUND SERVICE ALERT AT (800) 422-4133 AT LEAST 48 HOURS (TWO WORKING DAYS) PRIOR TO ANY 
<br />EXCAVATION WHICH MAY DAMAGE OR INTERRUPT THE SERVICE OF ANY UNDERGROUND UTILITY LINE. 
<br />16. USE FULL -DEPTH HEADER FOR VERTICAL FACES OF PCC CONSTRUCTION. 
<br />17. ANY PERMANENT BARRICADE OR SAFETY SIGN OMITTED ON THE PLANS AND CONSIDERED NECESSARY BY THE CITY 
<br />SHALL BE INSTALLED BY THE DEVELOPER AT NO COST TO THE CITY. 
<br />18. STREET LIGHTING- BEFORE ANY ELECTRICAL CABLE OR CONDUIT IS PLACED FOR STREET LIGHTS, THE LOCATIONS FOR 
<br />THE PROPOSED STREET LIGHTS ARE TO BE VERIFIED BY THE CONSTRUCTION INSPECTOR AT (714) 647-5074 AFTER 
<br />THESE LOCATIONS HAVE BEEN MARKED OUT AS SHOWN ON THE IMPROVEMENT PLANS BY THE 
<br />DEVELOPER/CONTRACTOR. 
<br />19. CLEANUP AND DUST CONTROL - THE CONTRACTOR SHALL KEEP THE WORKSITE CLEAN AND FREE FROM RUBBISH AND 
<br />DEBRIS AT THE END OF EVERY WORKING DAY AND PROTECT EXISTING IMPROVEMENTS PER SECTION 7-9 OF THE 
<br />STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION. 
<br />20. CONTACT TREE SECTION SUPERVISOR AT (714) 647-3337 BEFORE INSTALLING ANY TREES. 
<br />21. TO OBTAIN A PERMIT TO ACCESS WATER FROM A FIRE HYDRANT, CONTACT THE CITY YARD AT (714)647-3380. 
<br />Underground Service Alert 
<br />• of Southern California 
<br />TWO WORKING DAYS 
<br />BEFORE YOU DIG 
<br />Know what's below. 
<br />Cal before you dig. CAL aFUE �w ❑G www.DigAlert.org 
<br />NOTICE TO CONTRACTOR 
<br />PURSUANT TO ASSEMBLY BILL 4216 NO EXCAVATION PERMIT 
<br />IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS 
<br />A DIG ALERT TICKET NUMBER. CALL 811 AT LEAST TWO 
<br />WORKING DAYS PRIOR TO COMMENCING EXCAVATION. 
<br />FI LE N 0.: 
<br />Q, NUMBER DATE INITIALS 
<br />/O 
<br />0 ZIAI nA NN _j 
<br />A A 
<br />OFFSITE STREET IMPROVEMENT PLANS 
<br />S. ROSEWOOD AVE. AND 
<br />W. SEGERSTROM AVE. 
<br />SADDLEBACK HIGH SCHOOL 
<br />2802 S FLOWER ST. 
<br />SANTA ANA, CA 92707 
<br />LOCATION MAP N 
<br />(NOT TO SCALE) 
<br />PRIVATE ENGINEER'S NOTICE TO CONTRACTOR 
<br />ABBREVIATIONS 
<br />1. PRIVATE AND PUBLIC UTILITIES, IF SHOWN, REFLECT AVAILABLE RECORD DATA. THE CONTRACTOR 
<br />AB 
<br />AC 
<br />AGGREGATE BASE 
<br />ASPHALT CONCRETE PAVEMENT 
<br />SHALL BE RESPONSIBLE FOR LOCATING ALL LINES AFFECTING THIS WORK AND FOR ANY DAMAGE OR 
<br />ASPH 
<br />ASPHALT PAVING 
<br />PROTECTION TO THESE LINES. PRIOR TO STARTING CONSTRUCTION OF THIS PROJECT, THE 
<br />BC 
<br />BEGIN CURVATURE 
<br />CONTRACTOR SHALL UNCOVER ALL EXISTING UTILITY LINES AFFECTING THIS WORK AND VERIFY THE 
<br />BCR 
<br />BEGIN CURB RETURN 
<br />ELEVATIONS OF SAID UTILITY LINES. 
<br />BLVD 
<br />BM 
<br />BOULEVARD 
<br />BENCH MARK 
<br />2. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING ANY WORK SHOWN ON OR RELATED TO 
<br />BOP 
<br />BOF 
<br />BOTTOM OF PIPE 
<br />BOTTOM OF FOOTING 
<br />THESE PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE 
<br />BEGIN VERTICAL CURVATURE 
<br />PLACE TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL 
<br />CB 
<br />CB 
<br />CATCH BASIN 
<br />COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF THE U.S. DEPARTMENT OF 
<br />(L 
<br />CENTERLINE 
<br />LABOR, WITH THE "CONSTRUCTION SAFETY ORDERS" OF THE STATE OF CALIFORNIA DEPARTMENT OF 
<br />CONST 
<br />CONSTRUCT 
<br />INDUSTRIAL REGULATIONS AND WITH CALTRANS AREA TRAFFIC CONTROL HANDBOOK (WATCH). 
<br />CR 
<br />CT 
<br />CURB RETURN 
<br />COURT 
<br />HOWEVER, THE CONSTRUCTION ENGINEER AND THE CITY OF SANTA ANA SHALL NOT BE RESPONSIBLE 
<br />CL 
<br />CENTERLINE 
<br />IN ANY WAY FOR SAID COMPLIANCE BY THE CONTRACTOR OR ANY SUBCONTRACTORS. 
<br />DW 
<br />DOMESTIC WATER 
<br />D/W 
<br />DRIVEWAY 
<br />3. FURTHERMORE, THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE 
<br />SDMH 
<br />STORM DRAIN MANHOLE 
<br />CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL 
<br />DR 
<br />(E) 
<br />DRIVE 
<br />EXISTING 
<br />PERSONS AND PROPERTY THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE 
<br />E'LY 
<br />EASTERLY 
<br />LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND 
<br />E 
<br />EAST 
<br />HOLD THE OWNER, ENGINEER, AND THE CITY OF SANTA ANA HARMLESS FROM ANY AND ALL 
<br />EC 
<br />END CURVATURE 
<br />LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, 
<br />ECR 
<br />END CURB RETURN 
<br />EXCEPTING FOR LIABILITY ARISING FROM THE SALE NEGLIGENCE OF THE OWNER, THE ENGINEER, OR 
<br />EG 
<br />E 
<br />EDGE OF GUTTER 
<br />ELEVATION 
<br />THE CITY OF SANTA ANA. 
<br />EOC 
<br />EDGE OF CONCRETE 
<br />EOP 
<br />EDGE OF PAVEMENT 
<br />ESMT 
<br />EASEMENT 
<br />EVC 
<br />END OF VERTICAL CURVATURE 
<br />FG 
<br />GRADE 
<br />CERTIFICATION OF THE PRIVATE ENGINEER 
<br />FL 
<br />F ON WLD 
<br />FS 
<br />FINISHED SURFACE 
<br />THE UNDERSIGNED CIVIL ENGINEER HEREBY CERTIFIES THAT THE UTILITY LOCATIONS (GAS, ELECTRICAL, 
<br />FW 
<br />FIRE PROTECTION SERVICE WATER 
<br />TELEPHONE, PRIVATE WATER, CTV, ETC.) SHOWN ON THESE PLANS DIRECTLY REFLECT UTILITY COMPANY 
<br />GB 
<br />GRADE BREAK 
<br />LAYOUTS. 
<br />GR 
<br />GRATE 
<br />HP 
<br />HIGH POINT 
<br />INV 
<br />INVERT 
<br />LF 
<br />LINEAR FEET 
<br />LIP 
<br />LIP OF GUTTER 
<br />RCE NO. 68369 
<br />LP 
<br />LOW POINT 
<br />LT 
<br />LEFT 
<br />08/17/2021 
<br />KATHEREEN M. SHINKAI DATE 
<br />REVISIONS REFERENCES 
<br />DESCRIPTION APPROVED INSTALLED BENCHMARK NO.: OCS 1 E-104-75 ELEV.: 126.92' NAVD88 
<br />@ASIS OF BEARINGS: THE BASIS OF BEARING FOR THIS SURVEY IS BASED ON THE CALIFORNIA SYSTEM (CCS83), ZONE 6, NAD83, 
<br />OCS (2007.00) EPOCH ADJUSTMENT, AS DETERMINED LOCALLY BY A LINE BETWEEN CONTINUOUS GLOBAL POSITIONING STATIONS 
<br />(CGPS) 'SACY AND 'OEOC" BEING N80.43-39"E AS DERIVED FROM THE COORDINATES PUBLISHED AND ON FILE IN THE OFFICE OF 
<br />THE ORANGE COUNTY SURVEYOR. 
<br />HORIZONTAL DATUM: COORDINATES SHOWN ARE BASE ON THE CALIFORNIA COORDINATE SYSTEM OF 1983 (CCS83), ZONE VI, 
<br />NAD83 2007.00 EPOCH ADJUSTMENT. ALL DISTANCES SHOWN ARE GRID, UNLESS OTHERWISE NOTED. MULTIPLY GRID DISTANCES BY 
<br />1.00001963 TO OBTAIN A GROUND DISTANCE. ALL DISTANCES ARE BASED ON THE U.S. SURVEY FOOT. 
<br />CONSTRUCTION COMPLETED: 
<br />/O EN M. q! 
<br />m 
<br />R.C.E. 68369 
<br />* XP. 9 25 
<br />\T9T C 1 V 
<br />F OF CA��F� 
<br />MAX 
<br />MH 
<br />MIN 
<br />N 
<br />WILY 
<br />N TS 
<br />OC 
<br />OC* 
<br />()W 
<br />PA 
<br />P /L 
<br />POC 
<br />PRC 
<br />PVC 
<br />R 
<br />RCP 
<br />RIM 
<br />RT 
<br />R/W 
<br />S 
<br />S'LY 
<br />SCO 
<br />SD 
<br />SF 
<br />SHT 
<br />STA 
<br />STD 
<br />SMH 
<br />SPPWC 
<br />SWPPP 
<br />TC 
<br />TG 
<br />TOF 
<br />TOP 
<br />TW 
<br />TYP 
<br />U.N.O. 
<br />W 
<br />W'LY 
<br />WM 
<br />WARNER AVE. 
<br />W. SEGERSTROM 
<br />AVE. 
<br />v 
<br />w 
<br />� 
<br />z 
<br />MACARTHUR 
<br />af 
<br />0° 
<br />Vi 
<br />SITE SYMBOLS 
<br />SYM, DESC. 
<br />LEGEND 
<br />SYM. 
<br />DESC. DET. 
<br />PROPOSED FIRE HYDRANT 
<br />02/ 
<br />SAWCUT JOINT 9 
<br />_ 
<br />�- 
<br />EXISTING TREE 
<br />------- 
<br />-� 021 
<br />EXPANSION JOINT 9�. 
<br />PROTECT IN PLACE 
<br />__�___ 
<br />O 
<br />EXISTING MANHOLE 
<br />- - - - 
<br />LIMIT OF WORK_ 
<br />� 0 
<br />EXISTING ELECTRICAL 
<br />- 
<br />(E)PA 
<br />_T- 
<br />EXISTING PLANTING AREA 
<br />UTILITY_ 
<br />EXISTING SIGN 
<br />--W-- 
<br />WATERUTILITY 
<br />EXISTING PALM TREE � �^ 
<br />- - G- - 
<br />GAS UTILITY 
<br />PROTECT IN PLACE 
<br />__ 
<br />i -r 
<br />EXISTING WATER 
<br />__S__ 
<br />�W0 _UTILITY 
<br />_ _ __ 
<br />_- 
<br />SEWER UTILITY _ 
<br />EXISTING STREET 
<br />--E-- 
<br />ELECTRICAL UTILITY 
<br />_LIGHT _�_ 
<br />EXISTING STORM 
<br />T 
<br />-DRAIN ,UTILITY -___.._____.--. --_-- 
<br />MAXIMUM 
<br />W\NOTE: UVi1TS h/Nl ARE FOR REFERENCE ONLY. SEE 
<br />MANHOLE 
<br />CIVIL DWGS. FOR DETAILS AND EXACT LOCATIONS. FINAL 
<br />MINIMUM 
<br />NORTH 
<br />LOCATIONS TO 
<br />BE REVIEWED BY LANDSCAPE ARCHITECT. 
<br />NORTHERLY 
<br />NOT TO SCALE 
<br />ON CENTER 
<br />ON CURVE 
<br />ORANGE COUNTY PUBLIC WORKS 
<br />PROPOSED, NEW 
<br />PLANTING AREA 
<br />PROPERTY LINE 
<br />POINT OF CONNECTION 
<br />POINT OF REVERSE CURVATURE 
<br />POLYVINYL CHLORIDE 
<br />RADIUS 
<br />REINFORCED CONCRETE PIPE 
<br />TOP RIM OF STRUCTURE 
<br />RIGHT 
<br />RIGHT OF WAY 
<br />SOUTH OR SLOPE 
<br />SOUTHERLY 
<br />SEWER CLEANOUT 
<br />STORM DRAIN 
<br />SQUARE FEET 
<br />SHEET 
<br />STATION 
<br />STANDARD 
<br />SANITARY SEWER MANHOLE 
<br />STANDARD PLANS FOR PUBLIC 
<br />WORKS CONSTRUCTION 
<br />STORM WATER POLLUTION 
<br />PREVENTION PLAN 
<br />TOP OF CURB 
<br />TOP OF GRATE 
<br />TOP OF FOOTING 
<br />TOP OF PIPE 
<br />TOP OF WALL 
<br />TYPICAL 
<br />UNLESS NOTED OTHERWISE 
<br />WEST 
<br />WESTERLY 
<br />WATER MAIN 
<br />PREPARED UNDER 
<br />THE SUPERVISION 
<br />OF: 
<br />SYMBOLS 
<br />55 
<br />73 
<br />vicinity MAP N 
<br />(NOT TO SCALE) 
<br />SHEET INDEX 
<br />SHEET NUMBER 
<br />DESCRIPTION 
<br />1 
<br />TITLE SHEET 
<br />2 !DEMOLITION 
<br />PLAN 
<br />3 j 
<br />GRADING AND PAVING PLAN 
<br />4 
<br />NOTES AND SCHEDULES 
<br />5 
<br />MATERIALS PLAN 
<br />6 
<br />LAYOUT PLAN 
<br />7 
<br />ELEVATIONS AND SECTIONS 
<br />8 
<br />CONSTRUCTION DETAILS 
<br />9 
<br />i CONSTRUCTION DETAILS 
<br />10 
<br />, SEWER PLAN AND PROFILE 
<br />Al 
<br />� STRUCTURAL NOTES AND DETAILS 
<br />112 
<br />� TRAFFIC SIGNAL PLAN 
<br />13 
<br />I SIGNAGE AND STRIPING PLAN 
<br />0 
<br />N 
<br />G) 
<br />9 
<br />Cn 
<br />& 
<br />Z_ 
<br />@ 
<br />AND 
<br />ANGLE 
<br />AT 
<br />Q:� 
<br />Li 
<br />CENTERLINE 
<br />0 
<br />DIAMETER OR ROUND 
<br /># 
<br />POUND OR NUMBER 
<br />Li_ 
<br />APPROVEDBY 
<br />a b► L a •\,S�kbr, tar --- 3rl2oZ-4 
<br />NABIL SABA, P.E. DATE 
<br />EXECUTIVE DIRECTOR 
<br />PUBLIC WORKS AGENCY 
<br />AW z 3 Z z 
<br />R DOLF OSAS, P.E. DATE 
<br />CITY ENGINEER 
<br />R.C.E. NO. 73963 
<br />SENIOR CIVIL ENGINEER 
<br />KATHEREEN SHINKAI DESIGNED: AC DRAWN: ILL 
<br />REVIEWED FOR 
<br />PRINCIPAL CIVIL ENGINEER 
<br />RECOMMENDED FOR I4 
<br />( nNI.gTRI IC;TIC)N 
<br />OWNER /DEVELOPER 
<br />SANTA ANA UNIFIED SCHOOL DISTRICT 
<br />JULIE A. MOLLOY 
<br />SENIOR FACILITIES PLANNER 
<br />OFFICE: (714) 480-5367 
<br />MOBILE: (657) 336-0244 
<br />JU LI E. M OLLOY®SAU SD. U S 
<br />NA 
<br />N 
<br />0 
<br />0 
<br />0 (_0 
<br />0- N-) 
<br />me 
<br />0 
<br />DATz 
<br />E TITLE SHEET 
<br />05/2 CH01 
<br />CHECKED: KS SEGERSTROM AVENUE AT ROSEWOOD AVENUE w 
<br />PRINCIPAL CIVIL ENGINEER RCE NO.: 66219 
<br />949-261-1001 Office 
<br />949-260-1190 Fax 
<br />LPADesignStudios.com 
<br />5301 California Avenue 
<br />Suite 100 
<br />Irvine, California 92617 PROJECT ADDRESS: 
<br />ARCHITECTURE ENGINEERING INTERIORS 2802 S. FLOWER ST. 
<br />ANDSCAPE ARCHITECTURE PLANNING 
<br />100' W/O ROSEWOOD AVENUE TO 100' E/O ROSEWOOD AVENUE 
<br />PUBLIC WORKS AGENCY 01:� 
<br />CITY OF SANTA ANA SHEET 1 OF 13 n 
<br /> |