CITY OF SANTA ANA
<br />DEFINITION OF BID ITEMS
<br />PROJECT NO.: 25-6030
<br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD
<br />AVENUE
<br />Payment for the Installation of No. 6 Pull Box, shall be at contract unit price bid per Each Item
<br />listed in the Bid Proposal and shall be considered full compensation of furnishing all labor,
<br />materials, tools, equipment, removals, paving, landscape, repair, sidewalk restoration, and
<br />appurtenances for all related items of work necessary for the installation and no additional
<br />compensation will be allowed therefore.
<br />Bid Item No. 7 - Install No. 6E Pull Box
<br />This work consists of installing and/or replacing pull boxes including bolt down Fiberlyte Lid per
<br />City Std. Plan 1501 with bolts, the removal and/or modification of any interfering portions of
<br />existing pull boxes, conduit, PCC, concrete, and asphalt restoration, as indicated on plans.
<br />Payment for the Installation of No. 6E Pullbox, shall be at contract unit price bid per Each Item
<br />listed in the Bid Proposal and shall be considered full compensation of furnishing all labor,
<br />materials, tools equipment, removals, paving, landscape repair, sidewalk restoration, and
<br />appurtenances for all related items of work necessary for the installation, and no additional
<br />compensation will be allowed therefore.
<br />Bid Item No. 8 - IP Communication System
<br />This work consists of installing IP Communication System, Ethernet switch, power distribution
<br />unit, Fiber Distribution Unit, splice trays, pigtails, connectors, jumper cables, labeling and network
<br />configuration as indicated on plans and listed in the special provisions.
<br />Payment for the installation of IP Communication System shall be at contract unit price bid per
<br />Lump Sum listed in the Bid Proposal and shall be considered full compensation for furnishing all
<br />materials, labor, equipment, tools, and incidentals and no additional compensation will be allowed
<br />therefore.
<br />Bid Item No. 9 - Install 12 Strand SMFO
<br />This work consists of installing Corning Cable Systems Single Mode Fiber Optic Cable including
<br />trace wire, labeling, reel testing, OTDR testing and appurtenances complete and in place, of the fiber
<br />strands indicated on the plans.
<br />Payment for the installation of 12 Strand SMFO Cable, shall be at contract unit price bid per
<br />Linear Foot listed in the Bid Proposal and shall be considered full compensation for furnishing all
<br />materials, labor, equipment, tools, and incidentals and no additional compensation will be allowed
<br />therefore.
<br />Bid Item No. 10 - Fusion Splice Strand SMFO Cable
<br />This work consists of Fusion Splice 1 Strand Single Mode Fiber Optic Cable including pigtails,
<br />connectors, labeling, and OTDR testing as indicated on plans.
<br />Payment for the installation of Fusion Splice Strand SMFO Cable, shall be at contract unit price
<br />bid per Each Item listed in the Bid Proposal and shall be consider full compensation for furnishing
<br />3 of 8