My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 6.09 VITRIFIED CLAY PIPE (VCP) SEWER MAIN <br /> Where indicated on the plans,sanitary sewer pipe shall be extra strength vitrified clay pipe <br /> (VCP) with compression joints conforming to Subsection 207-8 of the Standard <br /> Specifications. <br /> Underground conduit construction shall conform to all applicable Subsections of Section <br /> 306 of the Standard Specifications,the Standard Plans and these Special Provisions. <br /> Potholing shall be considered as part of the excavation necessary for the work. The <br /> Engineer shall be given the opportunity to inspect the existing improvement when it is <br /> exposed. <br /> Any adjustments in line or grade which will be necessary to accomplish the intent of the <br /> plans shall be made. In the event obstructions are encountered during the progress of the <br /> work which will require alterations to the plans, the Engineer shall have the authority to <br /> change the plans and order the necessary deviation from the line or grade. Contractor shall <br /> not make any deviation from the specified line or grade without approval by the Engineer. <br /> Pipe sections shall not be deflected at any joint, either vertically or horizontally, beyond <br /> the limits specified by the manufacturer. <br /> The pipe and fittings shall be lowered into the trench.Do not throw the pipe or fittings into <br /> the trench. <br /> If it is determined that bypassing of sewer flow will be required, the bypass pumping <br /> system shall have sufficient capacity to pump the peak flow. Sewer bypassing shall <br /> conform to Section 6-21 of these Special Provisions. The Contractor shall provide bypass <br /> piping for the effluent during the construction of the sewer main between manholes. The <br /> inlet of the downstream manhole and the outlet of the upstream manhole shall be plugged. <br /> A portable pump shall be installed in the upstream manhole to discharge the effluent from <br /> the upstream manhole to the downstream manhole through the bypass piping. Pump and <br /> bypass piping shall be of adequate size and capacity to handle the flow without sewage <br /> backup occurring to facilities connected to the sewer. <br /> For sewers 12-inches in diameter and larger, or where deemed necessary by the City, the <br /> following shall apply: <br /> All pumps used shall be fully automatic self-priming units. All pumps used must be <br /> constructed to allow dry running for long periods of time to accommodate the cyclical <br /> nature of effluent flows. The Contractor shall provide the necessary stop/start controls for <br /> each pump. The Contractor shall have adequate standby equipment available and ready <br /> for immediate operation and use in the event of an emergency or breakdown. One standby <br /> pump for each size pump utilized shall be installed at the mainline flow bypassing <br /> locations, ready for use in the event of primary pump failure. The Contractor shall <br /> continually monitor all pumping equipment. The Contractor shall perform leakage and <br /> 92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.