My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> • For gravity bypasses, the plans shall include locations of temporary flow-through <br /> plugs, sewer plugs and bypass discharge piping. <br /> • A description of how the bypass system will be controlled and operated. Describe <br /> the method of control, the procedure and time requirements for switching to the <br /> standby equipment and alarm notification. <br /> • Capacities of pumps, prime movers and standby equipment. Design calculations <br /> proving adequacy of the bypass system and selected equipment. <br /> • Standby power source for bypass pumping. <br /> • Staffing plan for maintaining equipment for 24-hour continuous,reliable operation <br /> on weekdays and/or weekend days. <br /> • Noise and Odor Control Plan. <br /> • Plan showing the existing sewer line and the proposed points of flow interruption <br /> and/or flow diversion. <br /> • Construction time schedule showing anticipated times of flow interruption and/or <br /> flow diversion. <br /> • Spill Contingency Plan detailing precautions to be implemented to prevent sewage <br /> spills including specific responses and control measures to follow during an <br /> overflow resulting from breakage or blockage and maintenance and inspection <br /> schedules to detect potential problems to mitigate the potential release resulting <br /> from overflows, bypass pipe ruptures, and blockages, <br /> The Contractor shall provide temporary pumps, conduits, and other equipment to bypass <br /> the sewer flow. Engine-driven pumps shall be equipped with mufflers and/or shall be <br /> enclosed to keep the noise level within the City's Noise Ordinance. Pumps and bypass <br /> lines shall be of adequate capacity and size to handle the flows. <br /> Bypass duty and standby pumps shall be designed for raw sewage applications,resistant to <br /> ragging, and capable of passing a 3-inch solid sphere. Pumps shall be self-priming with <br /> suction lift sufficient to avoid sewer surcharge. The self-priming system shall allow the <br /> pump to start dry and run dry without causing damage. Pumps may be equipped with a <br /> vacuum assisted self-priming device. Any orifice designed to discharge air during pump <br /> priming shall be connected to a portable activated carbon scrubber. All engines shall be <br /> critically silenced for sound control and regardless of noise level, soundproofmg shield not <br /> less than eight feet high shall be provided around each engine to absorb noise. 100% <br /> standby pumping shall be provided. Standby pump shall be sized to match the duty pump. <br /> Standby pumping equipment shall be at the site continuously during bypassing to provide <br /> standby pumping capacity. <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.