Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Sanitation District(OCSD)where wastewater treatment occurs.The Contractor shall notify <br /> the City and identify any by-products produced as a result of the installation operations, <br /> test and monitor the levels, and comply with any and all waste discharge requirements. <br /> The CIPP Liner Pipe shall be continuous and jointless from manhole to manhole or access <br /> point to access point and shall be free of all defects that will affect the long term life and <br /> operation of the pipe. The CIPP Liner Pipe shall fit sufficiently tight within the existing <br /> pipe so as to not leak at the manholes, at the service connections or through the wall of the <br /> installed pipe. If leakage occurs at the manholes or the service connections the Contractor <br /> shall seal these areas to stop all leakage using a material compatible with the CIPP Liner <br /> Pipe as directed by the City. If leakage occurs through the wall of the pipe the liner shall <br /> be repaired or removed at the Contractor's expense. <br /> All materials, shipped to the project site, shall be accompanied by test reports certifying <br /> that the material conforms to the ASTM standards listed herein. Materials shall be shipped, <br /> stored, and handled in a manner consistent with written recommendations of the CIPP <br /> system manufacturer to avoid damage. Damage includes, but is not limited to, gouging, <br /> abrasion, flattening, cutting, puncturing, or ultra-violet (UV) degradation. All damaged <br /> materials shall be promptly removed from the project site at the Contractor's expense and <br /> disposed of in accordance with all current applicable regulations. <br /> The fabric tube shall consist of one or more layers of absorbent non-woven felt fabric, <br /> felt/fiberglass or fiberglass and meet the requirements of ASTM F 1216, ASTM F 1743, <br /> ASTM D 5813 &ASTM F2019.The fabric tube shall be capable of absorbing and carrying <br /> resins, constructed to withstand installation pressures and curing temperatures and have <br /> sufficient strength to bridge missing pipe segments,and stretch to fit irregular pipe sections. <br /> The contractor shall submit certified information from the felt manufacturer on the nominal <br /> void volume in the felt fabric that will be filled with resin. <br /> The wet-out fabric tube shall have a uniform thickness and excess resin distribution that, <br /> when compressed at installation pressures, will meet or exceed the design thickness after <br /> curing. <br /> The wall color of the interior pipe surface of CIPP after installation shall be a light, <br /> reflective color so that a clear detailed examination with closed circuit television inspection <br /> equipment may be made.The hue of the color shall be dark enough to distinguish a contrast <br /> between the fully resin saturated felt fabric and dry or resin lean areas. <br /> The outside of the fabric tube shall be marked every 5 feet with the name of the <br /> manufacturer or CIPP system, manufacturing lot and production footage. <br /> The resin shall be a corrosion resistant polyester or vinyl ester resin and catalyst system <br /> that when properly cured within the tube composite meets the requirements of ASTM <br /> F1216, ASTM F1743 or F2019, the physical properties herein, and those, which are to be <br /> utilized in the design of the CIPP for this project. The resin shall produce CIPP which will <br /> 112 <br />