My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> DEFINITION OF BID ITEMS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Bid Item No.26- CCTV Inspection of Existing Sewer Main and Laterals (Pre and Post <br /> Construction) <br /> The work under this item consists of performing a pre-construction and a post-construction CCTV <br /> inspection of the existing sewer main and laterals. <br /> Payment for this item shall be at the contract unit price bid per Lump Sum as listed in the Bid <br /> Proposal,and shall include full compensation for doing all work,including furnishing all materials, <br /> labor, equipment, tools, removals, disposal of materials and incidentals as required and no <br /> additional compensation will be allowed therefore. <br /> Bid Item No. 27- Temporary Above Ground Sewer Line with Backup Pumps and Tractor <br /> Truck <br /> Payment for this item shall be at the contract unit price bid per Lump Sum as listed in the Bid <br /> Proposal,and shall include full compensation for doing all work,including furnishing all materials, <br /> labor, equipment, tools, and incidentals as required and no additional compensation will be <br /> allowed therefore. <br /> Bid Item No.28- Pedestrian Barricade <br /> Payment for this item shall be at the contract unit price bid per Linear Foot as listed in the Bid <br /> Proposal,and shall include full compensation for doing all work,including furnishing all materials, <br /> labor, equipment, tools, and incidentals as required and no additional compensation will be <br /> allowed therefore. <br /> Bid Item No.29- Project Advertising Sign(s) <br /> Payment for Project Advertising Sign shall be at the contract unit price bid per Each item listed <br /> in the Bid Proposal, and shall include full compensation for doing all work, including furnishing <br /> all materials,labor,equipment,tools,disposal of all removed materials,and incidentals as required <br /> and no additional compensation will be allowed therefore. <br /> Bid Item No. 30- Construction Permit <br /> The work under this item consists of obtaining a Construction Permit at the City of Santa Ana <br /> Public Works Development Services counter and making the required deposit (refer to Section 2- <br /> 2a,Construction Permit, of these Special Provisions). <br /> Payment for Construction Permits shall be at the contract unit price bid per Lump Sum listed in <br /> the Bid Proposal, and shall include full compensation for doing all work and no additional <br /> compensation will be allowed therefore. <br /> 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.