GENERAL NOTES <br /> A. CONTRACTOR SHALL USE A VACUUM TO ABSORB SEDIMENTS DURING SAWCUTTING OPERATION AND DISPOSE <br /> OFFSITE. <br /> B. CONTRACTOR SHALL REMOVE ANY GEOTEXTILE MATERIALS ( INCLUDING CEMENT TREATED BASE) AND <br /> DISPOSE OFFSITE. <br /> C. WHEN ALLOWED PLACEMENT OF SLURRY BACKFILL, THE CONTRACTOR SHALL NOT BASE PAVE FOR A <br /> MINIMUM OF 24 HOURS. BASE PAVING SHALL BE DONE 1" BELOW FINISHED GRADE USING TYPE <br /> III-B3-AR-4000 ASPHALT AND THE EDGES SHALL BE RAMPED TO EXISTING USING COLD MIX AT (1 :12) <br /> SLOPE. FINAL PAVING SHALL BE DONE IMMEDIATELY AFTER THE BASE PAVING USING <br /> TYPE III-C3-AR-4000 ASPHALT. <br /> D. PCC (PORTLAND CEMENT CONCRETE) USED FOR STREET PAVEMENT SHALL BE MINIMUM <br /> CLASS 560-A-3250. <br /> E. REFER TO THE CITY'S MUNICIPAL CODE FOR THE EXCAVATION RESTRICTIONS UNDER PAVEMENT <br /> MORATORIUM. <br /> F. TEMPORARY PAVING: <br /> I. ALL TRENCHES SHALL BE BACKEILLED AND HAVE TEMPORARY PAVEMENT CONSTRUCTED OR COVERED WITH <br /> STEEL RECESSED TRAFFIC PLATES AT THE END OF EACH WORKING DAY. <br /> IN THE EVENT STEEL PLATES CANNOT BE RECESSED. THE MINIMUM ASPHALT TAPER (COLD MIX) SHALL <br /> BE (12:1 ) RATIO, AS DETERMINED BY THE CITY ENGINEER. <br /> Ii. WITHIN FOUR CONSECUTIVE CALENDAR DAYS FOLLOWING INSTALLATION OF THE CONDUIT, OR <br /> AFTER COMPACTION IS APPROVED BY THE CITY ENGINEER, WHICHEVER COMES FIRST STEEL TRAFFIC <br /> PLATES SHALL BE REMOVED AND THREE INCHES OF TEMPORARY PAVEMENT SHALL BE CONSTRUCTED <br /> FLUSH WITH EXISTING PAVEMENT. <br /> ill. CROSS STREETS ARE TO BE PAVED WITH TEMPORARY PAVEMENT ON THE SAME DAY OF EXCAVATION. <br /> TEMPORARY PAVEMENT SHALL BE MAINTAINED SO THAT A SMOOTH TRAVERSABLE SURFACE IS AVAILABLE <br /> AT ALL TIMES FOR VEHICULAR TRAFFIC AND SHALL BE FREE FROM RUTS, DEPRESSIONS, HOLES AND <br /> LOOSE GRAVELS. <br /> iv. TEMPORARY PAVING SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR BEFORE THE PERMANENT <br /> RESURFACING IS PLACED. <br /> G. PERMANENT PAVING: <br /> I. PERMANENT PAVEMENT RESTORATION SHALL BE COMPLETED IMMEDIATELY AFTER THE TRENCH IS <br /> BACKFILLED, AND COMPACTION HAS BEEN APPROVED BY THE CITY ENGINEER. <br /> I . TACK COAT IS REQUIRED FOR ALL AC PAVEMENT TRENCHING OPERATIONS. <br /> ii. DENSITY AND SMOOTHENESS SHALL BE DONE PER THE "GREENBOOK" SECTION 302-5.6.2. <br /> H. USE OF ROCKWHEEL IS NOT PERMITTED ON PCC PAVEMENT AND ON TRENCHES GREATER THAN 10" <br /> UNLESS WIHT PRIOR APPROVAL BY THE CITY ENGINEER. <br /> 4,1 t <br /> b ,% <br /> Gi ��� .'-; �A <br /> APP D ' S06 a CITY OF SANTA ANA oSANIA ANA, <br /> CITY ENGINEER - PUBLIC WORKS AGENCY <br /> DATE REVISION STD. PLAN <br /> 12/I4/OB REVISED BTANOAHO PLAN NUMBER UTILITY TRENCH DETAIL NUMBER <br /> ` ASPHALT CONCRETE PAVEMENT 1150 <br /> TRENCH PAVEMENT REQUIREMENTS SHEETS OF 1 <br />