My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> The marking shall be Pull box lid shall be made of <br /> "Signal"for traffic lightweight, high strength <br /> signal circuits or C \ composite material (Fibrelyte by <br /> "Communication"for • ; Oldcastle Christy or City <br /> communication circuits. • approved equivalent) <br /> A44,001:0(vote A <br /> T *VA i I <br /> isi#`• t • / Lift hole <br /> �\ J <br /> Pull Box shall be made TOP VIEW <br /> of reinforced Portland Top of the pull box shall be <br /> cement concrete with #6 AWG Bonding flush with surrounding grade <br /> plastic lining Jumper <br /> . .. ....................... . ...111k, , , , , , , , , , <br /> • <br /> ...... iz <br /> ,. . < < <, > . >t>':�>�> > >�>p,> <br /> 4" (100 mm)min. <br /> 10'Copper clearance for ex. conduits y\\ S dustyng Compound <br /> Ground Rod 'i�\ f�Nel a�, (typical for all <br /> \. p s conduit ends) <br /> 2"(50 mm) 1 / Grounding <br /> 4 Bushing <br /> 6" 150 mm 0 sib iocjr�4.soen� �,a.,a;• ^per a <br /> ( ) 0 mia�iallis�.a4 r.toden,�^qtt a 1 LI 12"(300 mm) <br /> Crushed Rocks i'`11.4r s`�0 1 .�.�. den o,,o o O Extension When Specified <br /> 10( <br /> • <br /> SECTION A-A <br /> Notes: <br /> 1. All new pull boxes shall be size No.6, unless shown differently on plans approved by the City, <br /> or as directed by the City's Traffic Engineer. <br /> 2. All existing pull boxes that are within the sidewalk/wheelchair ramp rehabilitating or <br /> improvement areas shall be replaced with new pull boxes. <br /> 3. No new pull box shall be installed In roadway or driveway unless it is approved by the City's <br /> Traffic Engineer. If approved, only traffic loading type pull box and lid shall be used. <br /> 4. See Caltrans Standard Plans for pull box sizes,dimensions, and traffic pull box details. <br /> 5. A 10'ground rod in the pull box is required to ground traffic signal pole if the conduit from <br /> the pole to the pull box is non metallic. , :4-; <br /> APPROVED: DATE: 06/10/2021 SANTA ANA <br /> CITY OF SANTA ANA <br /> CITY ENGINEER PUBLIC WORKS AGENCY <br /> DATE REVISION STD.PLAN NO. <br /> 4/25/08 Revised notes Traffic Signal & <br /> SA Communication Pull Box 1501 <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.