Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Engineer weekly to facilitate timely assessment and coordination of upcoming construction <br /> activities. <br /> 6-6 SUSPENSION OF THE WORK <br /> 6-6.1 General <br /> Add the following to this subsection: <br /> Should suspension of work be ordered by reason of the failure of the contractor to carry out orders <br /> or to perform any provisions of the contract; or by reason of weather conditions being unsuitable <br /> for performing any item or items of work; the contractor, at its expense, shall do all the work <br /> necessary to provide a safe,smooth, and unobstructed passageway through construction for use by <br /> public traffic during the period of such suspension. In the event that the contractor fails to perform <br /> the work above specified, the City will perform such work and the cost thereof will be deducted <br /> from payment due or to become due to the contractor. <br /> If a suspension of work is ordered by the Engineer, due to the failure on the part of the contractor <br /> to carry out orders given or to perform any provision of the contract, the days on which the <br /> suspension order is in effect shall be considered working days. <br /> SECTION 7 - MEASUREMENT AND PAYMENT <br /> 7-2 LUMP SUM WORK <br /> Add the following to this subsection: <br /> Contractor shall submit for approval a schedule of values for all lump sum work. Failure to submit <br /> may delay payment for said work. <br /> 7-3 PAYMENT <br /> 7-3.1 General <br /> Add the following to this subsection: <br /> Payment for any items of work required by the plans, specifications or other contract documents, <br /> which are not covered by a contract bid item, shall be considered as included in other items and <br /> no additional compensation shall be paid therefore. <br /> 7-3.4 Mobilization <br /> Add the following to this subsection: <br /> Mobilization shall consist of preparatory work and operations including, but not limited to, those <br /> necessary for the movement of personnel, equipment, supplies and incidentals to the project site. <br /> Mobilization shall additionally include the establishment of any temporary facilities, utilities, <br /> construction fencing and barricades, and the provision and installation of project signs. <br /> A minimum of one week before the start of construction,the Contractor shall video all areas where <br /> construction is to take place. The video shall be supplied to the Engineer before constructions <br /> 18 <br />