My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Agreements for On-Call Water Resources Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
02/18/2025
>
Item 14 - Agreements for On-Call Water Resources Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2025 3:39:41 PM
Creation date
2/12/2025 10:46:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
2/18/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE SCHEDULE <br />City of Santa Ana RFP #24-083 <br />CONE PENETRATION TESTING (CPT) SERVICES/PRICING (portal to portal*): <br /> CPT Soundings w/ CPT, Direct Push, Limited or Track Rig 370.00 / hr <br /> CPT Soundings w/ CPT, Direct Push, Limited or Track Rig (Overtime)410.00 / hr <br /> CPT Soundings w/ CPT, Direct Push, Limited or Track Rig (Double time)450.00 / hr <br /> Minimum Call Out for CPT Soundings w/ CPT, Direct Push, Limited or Track Rig (4 hrs or less)1,900.00 / day <br />CPT SERVICES/PRICING INCL. PREVAILING WAGE (portal to portal*): <br /> CPT Soundings w/ CPT, Direct Push, Limited or Track Rig 520.00 / hr <br /> CPT Soundings w/ CPT, Direct Push, Limited or Track Rig (Overtime)580.00 / hr <br /> CPT Soundings w/ CPT, Direct Push, Limited or Track Rig (Double time)640.00 / hr <br /> Minimum Call Out for CPT Soundings w/ CPT, Direct Push, Limited or Track Rig (4 hrs or less)2,700.00 / day <br />SOIL, GROUNDWATER, VAPOR SAMPLING SERVICES/PRICING (portal to portal*): <br /> Direct Push, Limited or Track Rig 270.00 / hr <br /> Direct Push, Limited or Track Rig (Overtime)310.00 / hr <br /> Direct Push, Limited or Track Rig (Double time)350.00 / hr <br /> Minimum Call Out for Direct Push, Limited or Track Rig (4 hrs or less)1,400.00 / day <br />SOIL, GROUNDWATER, VAPOR SAMPLING INCL. PREVAILING WAGE (portal to portal*): <br /> Direct Push, Limited or Track Rig 400.00 / hr <br /> Direct Push, Limited or Track Rig (Overtime)460.00 / hr <br /> Direct Push, Limited or Track Rig (Double time)520.00 / hr <br /> Minimum Call Out for Direct Push, Limited or Track Rig (4 hrs or less)2,000.00 / day <br />OTHER SERVICES/PRICING: <br /> Seismic Shear Wave Measurements w/ CPT Rig 30.00 / ea <br /> Pore Pressure Dissipation Testing w/ CPT Rig (no charge w/ daily rate)no charge <br /> Pore Pressure Dissipation Testing w/ CPT Rig (no charge w/ daily rate, incl. Prevailing Wage)no charge <br /> Concrete Coring (up to 8” thick)150.00 / core <br /> Per Diem/Two Man 500.00 / nt <br /> Fuel Surcharge 50.00 / day <br /> Cancel Fee (if notified less than 4 business days before job start)900.00 / ea <br />MATERIALS: <br /> Acetate Liners (1” dia x 2’ length)3.00 / ea <br /> Acetate Liners (1 ¾” dia x 4’ length) 4.50 / ea <br /> PVC Blank (3/4” or 1” dia), Flush Threaded 3.50 / ft <br /> PVC Screen (3/4” or 1” dia), Flush Threaded 4.00 / ft <br /> PVC Caps 1.00 / ea <br /> Bentonite Granules / Portland Cement / Concrete / Sand / Asphalt Patch 15.00 / ea <br /> Aquaphalt (3.5 gal bucket)100.00 / ea <br /> Bentonite Grout 30.00 / ea <br /> Waste Drum (55 gallon) 75.00 / ea <br /> Polyethylene Tubing for Groundwater (3/8” dia) & Vapor Sampling (1/4” dia)0.25 / ft <br /> Nylon (NylaFlow) Tubing for Vapor Sampling (1/4” dia)0.75 / ft <br /> Teflon Tubing for Vapor Sampling (1/4” dia)2.00 / ft <br /> Vapor Valves 3.00 / ea <br /> Vapor Filter/Implant (1/4” Polypropolene) 2.00 / ea <br /> Disposable Steel Tips for Groundwater Sampling / Vapor Sampling 10.00 / ea <br />* Portal to portal time includes travel time & loading/unloading equipment. It is also included in total hours estimated. <br />(Rev.07/19/24) <br />** All unit prices are subject to change. Must call for an estimate based on a specific scope of work. <br />*** If a Project Labor Agreement, Community Workforce Agreement, etc. is associated with this scope of work, this fee <br />schedule will be null and void. A new fee schedule including union fees will need to be requested. <br />KEHOE TESTING & ENGINEERING, INC. <br />_____________________________________________________________________________________________________ <br /> 5415 Industrial Drive * Huntington Beach, CA 92649-1518 * (714) 901-7270 ofc * (714) 901-7289 fax * www.kehoetesting.com
The URL can be used to link to this page
Your browser does not support the video tag.