My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street Corridor Specific Plan <br />March 2018 <br />4.1 Land Use <br />Objectives: <br />Chapter 4 Planning Goals and Goal: <br />• Relocate the mini -mall and strip commercial land uses that <br />Objectives Utilize the development of the Bristol Street Corridor as an <br />are typical for high volume arterials from their mid -block <br />opportunity to upgrade the development character of the area <br />locations to new development on existing shopping center <br />and to enhance the viability of those commercial enterprises <br />sites or in new commercial buildings near the intersections <br />which remain. <br />with major cross streets. <br />• Encourage commercial activity along the corridor as a <br />Rationale: <br />means of generating revenues for the City through fees <br />There are a number of existing neighborhood shopping <br />and sales tax revenues. <br />centers and several adjacent blocks of street oriented <br />• Retain as many existing businesses as possible and <br />commercial development along the Bristol Street Corridor <br />encourage their rehabilitation and possible expansion, <br />which have the potential for continued operation. Many of <br />Businesses which serve and benefit local residents and <br />the existing businesses appear to be marginal in their <br />provide high levels of employment will receive highest <br />operation, but provide important services to the local <br />priority for retention and rehabilitation. Parcels which are <br />residents and would benefit from improved conditions along <br />stagnant and underutilized will be re -planned. <br />the corridor which would make it more attractive. Other uses <br />• Assemble parcels where necessary to provide adequate <br />detract from the character of the corridor and are less <br />replacement area for remaining businesses that have lost <br />dependent on their particular location. Widening of the <br />important space or facilities to the road widening. <br />Corridor has affected many business operations with the <br />• Replace residential uses fronting Bristol Street with others <br />Corridor either by removing parking or structures. The Specific <br />compatible to the commercial character of the corridor. <br />Plan represents the opportunity to encourage and enhance <br />• Develop frontage parcels not to be of a type to detract <br />continued operation of those businesses which will contribute <br />from the overall image and character of Bristol Street. <br />most to the design and land use character chosen for the <br />Goal: <br />corridor. <br />Protect and enhance adjacent residential areas and <br />community facilities along the Bristol Street Corridor by <br />reducing the potential for adverse impacts related to traffic or <br />other uses within the corridor. <br />Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.