Laserfiche WebLink
appurtenances and appurtenant work, in the following streets and <br />easements in said City of Santa Ana: <br /> <br /> 1. Cc~aencing at a manhole to be constructed in the <br />e~.isting sewer main line in Fifth Street in its c~on intersection <br />wlth Huylar's Lane, a private street, thence northerly.in Fifth <br />Street and Huylar's Lane, and the Sewer easements here~nbefor, e <br />described as Parcels 1 and 2 to a manhole to be constructed in said <br />sewer easement, Parcel 2, 667.22 feet north of said existing sewer <br />main line in Fifth Street; thence continuing generally easterly <br />in the sewer easement hereinbefore described as Parcel 2, 722.50 <br />feet to a manhole to be constructed at the intersection of said <br />sewer easement and t~e ~outherly terminus of Morse Drive, a private <br />street; thence contxnu~ng northerly in Mm~se Drive592 f~et to a <br />manhole to be constructed in the intersectzon of Morse Drmve and <br />Hazard Avenue; thence continuing westerly in Hazard Avenue 140 feet <br />to a manhole to be constructed in the intersection of Hazard Avenue <br />and West Street; thence continuing northerly in West Street 1325.95 <br />feet to a manhole to be constructed in West Street. <br /> <br /> 2. Easterly in Fay Circle for a distance of 165 feet <br />from a manhole to be constructed in the main sewer line to be <br />installed in West Street as hereinbefore set forth to the end of a <br />sewer lateral to be constructed in Fay Circle at its easterly <br />terminus. <br /> <br /> 3. Easterly in Mary Circle for a distance of 170 feet <br />from a manhole to be constructed in the main sewer line to be in- <br />stalled in West Street as hereinbefore set forth to the end of a <br />sewer lateral to be constructed at the easterly terminus of Mary <br />Circle. <br /> <br /> 4. C,....-.encing at a manhole robe constructed in the inter- <br />section of West Street and Georgine Street in the main sewer line <br />to be installed in West Street as hereinbefore set forth, thence <br />easterly in West and Georgine Streets 400.55 feet to a manhole to <br />be constructed in the intersection of Georgine Street and Elaine <br />Drive; thence continulng southerly in Elaine Drive 887 feet to a <br />manhole to be constructed in xts intersection.with Celeste Street, <br />and thence continuing westerly in Celeste Street 400.27 feet to a <br />manhole to be constructed in its intersection with West Street in <br />the sewer main line to be installed in West Street as hereinbefore <br />set forth. <br /> <br /> 5. Commencing at the manhole to be constructed in the <br />intersection of Hazard Avenue and Morse Drive, as hereinbefore set <br />forth, thence easterly in Hazard Avenue 400 feet to a manhole to <br />be constructed with an eight inch stub facing east in its inter- <br />section with La Vergn Way, a private street; thence continuing <br />~outherly in La Vergn Way 594 feet to a manhole to be constructed <br />xn its intmrsectionwith the sewer easement hereinbefore described <br />as Parcel 2; thence continuing westerly in said sewer easement <br />401 feet to the manhole to be constructed as hereinbefore set <br />forth in the intersection of said sewer easement and Morse Drive. <br /> <br /> SECTION 2: All of the above mentioned work, including <br />the grade to which said work shall be done and the location thereof <br />in and upon the streets and rights of way above mentioned, shall <br />be done upon the grades, along the lines, between the points, of <br />the dimensions, at the places and in the manner described and set <br /> <br />-2- <br /> <br /> <br />