<br />On motion of Councilman Jerome,
<br />
<br />seconded by Dahl and carried, the
<br />
<br />Clerk was authorized to open bids for the furnishing of 2,064 lineal
<br />
<br />feet of 16", Class 150 concrete cylinder pipe; 6 - 32 foot lengths of
<br />
<br />16", Class 150 concrete cylinder pipe with spigo$ adapter for cas~
<br />
<br />iron and hubs for concrete cylinder, and 7 - 32 foot lengths of 16",
<br />Class 150 concrete cylinder pipe with spigot adapters for cast iron
<br />
<br />and spigots for concrete cylinder, as follows:
<br />
<br />Bid of American Pipe and Construction Co.:
<br />Bond in the sum'of $2500.00.
<br />Approximate
<br />Quantity Unit
<br />~,06~ lin'.'ft. 1--~
<br />
<br />6 only 16"
<br />
<br />7 only 16"
<br />
<br /> Description
<br />Concrete cylinder pipe, Class
<br />150
<br />Concrete cylinder pip~,Class
<br />150, 32-ft. long, with spigot end
<br />adapted for connections to cast
<br />iron pipe and with concrete cylinder
<br />pipe bell on other end 213.44
<br />Concrete cylinder pipe, Class
<br />150, 32-ft. long, with spigot end
<br />adapted for connections to cast
<br />
<br />M,nit Prices.
<br />
<br /> ~ 4.8B ft.
<br />
<br />iron pipe and with concrete
<br />cylinder pipe spigot on other end 213.B~
<br />Motor truck delivery as close to the line of trench as is
<br />practicable. Prises are net and include California State
<br />Sales Tax. Delivery within B5 days from date of award.
<br />Bid of United Concrete ~ipe Corporstion: 10~ bond.
<br />h,06B lineal feet of 1.6 , Class 150 concrete cylinder pipe.
<br />Six Joints with spigot.adapter for cast iron and hubs for concrete
<br />cylinder pipe. -Seven Joints with spigot adapters for cast iron
<br />and spigots for concrete cylinder pipe. Lump sum of $23,900.00.
<br />Price includes delivery of pipe unloaded trench-side where
<br />accessible to truck and ~trailer. Delivery 50 days after receipt
<br />of Qrder and complete at the rate of 600 lineal feet per day.
<br />P~ee is net and includes California State Sales Tax.
<br />On motion of Councilman Dahl, seconded by Larsen and carried, the
<br />
<br />ea.
<br />
<br />bids were referred to the Manager and Director of Public Works for
<br />
<br />report at this meeting.
<br />,,
<br />On motion of Councilman Dahl,
<br />
<br />seconded by Jerome and carried, the
<br />
<br />Clerk was authorized to open bids for the furnishing of 3500 feet of
<br />14" O.D. 10 gauge steel pipe and 88 couplings, as follows:
<br />
<br />Bid of Southern Pipe and Casing Co.:
<br />Bond in the sum of 10%.
<br />Approximately 3500 ft. of 14" OD or 1B-l/2" O.D.
<br />#10 Gauge, automatic electric fusion welded steel
<br />pipe, double asphaltum dipped, in ~0 ft. or B8 ft.
<br />lengths, with PresSeal rubber gasket Joint ends, per ft.
<br />Approximately 3500 ft. of 14" OD or 14-1/2" O.D.
<br />#10 Gauge, ditto,~except with ends prepared for use
<br />with "Southern" bolted couplings and including the
<br />couplings, per ft.
<br />Prices are net, f.o.b, trucks trench side in or near
<br />Santa Ana, and are firm. Any applicable taxes will be
<br />added. Shipment can be made within 30 days after
<br />receipt of order, except lB" O.D. with southern bolted
<br />Joints, which would be approximately 60 days.
<br />
<br />~2.16
<br />
<br />$2.28
<br />
<br />Bid of Armco Drainage & Metal Products, Inc.,:
<br />Bond in the sum of $800.00.
<br />3500 ft. - lB" OD #10 gauge Armco spiral welded
<br />steel pipe - double asphalt dipped- made in B0
<br />ft. lengths with ends for dresser couplers @ $1.89
<br />88 - 14" OD Style #38 Dresser couplers @ 12.64
<br />
<br />Quotation as listed is f.o.b, trench site; consignee
<br />to provide assistance in unloading. Price as quoted
<br />is subject to a discount of 1/2 of 1% for cash in ten
<br />days, thirty days net. Any applicable sales taxes
<br />are to be added to prices. 'Delivery can be made with-
<br />in three weeks aft~er receipt of notice of award, of
<br />contract.
<br />
<br />$6,615.00
<br /> 1,112.32
<br />$7,727.32
<br />
<br />Bid of H.J.Lorenz Co. Inc.:
<br />Bond in the sum of 10%.
<br />3500~ lineal - IB" O.D. x l0 Ga. new steel pipe, BO! lengths.
<br />double-dipped, ends prepared for dresser couplings @ ~.01 Der ft.
<br /> 7,035.00.
<br />88 Dresser couplings to fit ~he above pipe @ $15.50 ea. $1,36B.00.
<br />Pipe and couplings quoted f.o.b, trench-site. Delivery
<br />within two to three weeks. Terms 1% - ten days - 30 days net.