Laserfiche WebLink
In Re <br />Bids <br />Const.'etorm drain <br />French, Spurgeon tts. <br />etal <br /> <br />All equipment is guaranteedfor 90 days against <br />defcctive material by the manufacturer. Price <br />on equipment does not include state sales tax. <br />For the total sum of $4,430.00. <br />· Delivery will be completed fifteen days after <br />-contract is awarded.. <br /> <br />-Bid of Wallace Tractor Sales: <br />· Cashier's check in ~he sum of $469.00. <br />· For the total sum of.$4,687.88. <br />.Delivery will be eompleted not later than <br />.April 30th, 1954. <br />-Furnish a Wagner ~F#3 Skip-loader and Dozer <br />.blade, on a Ferguson.TO 30 Ab tractor and the <br />· Everett trencher at total price of <br />ion motion of Councilman Dahl, seconded by Lateen and carried, the bld~ <br /> <br />were referred to the Manager and Director of Public Works for report <br /> <br />at this meeting. <br />. <br />On motion of Councilman McBride, <br /> <br />seconded by Dahl and carried, bids <br /> <br />.were ordered opened for the construction of a storm drain on French, <br /> <br />.Spurgeon and Bush Street from First Street to Washington Avenue, as <br /> <br />·follows: <br /> <br />.Bid of Bosko & Bradarich Company: <br />.Bond in the sum of 10%. <br /> <br />.Item Unit <br />.No., Price <br />· I $ 20.50 <br />· 2 18.53 <br />· ~ 15.oo <br /> 13.0o <br />~ lO.5O <br /> 8.15 <br /> 7 1,127.13 <br /> 8 5?2.29 <br /> 9 863.50 <br /> 10 660.28 <br /> 11 1,810.13 <br /> 12 1,152.05 <br /> 13 1,205.30 <br /> 522.50 <br /> <br /> Total <br />$ oo <br /> ll 710.96 <br /> 19 290.00 <br /> 9 659.00 <br /> 3 423.00 <br /> 4 735.15 <br /> 1 127.13 <br /> 572.29 <br /> 863.50 <br /> 660.28 <br /> · 1,810.13 <br /> 1,152.05 <br /> 1,205.30 <br /> 1,045.00 <br /> <br />~,and Total <br /> <br />$87,101.79 <br /> <br />Bid of V.C.K.Construction Company: <br />Bond in the sum of 10%. <br /> <br />Item Unit <br />O <br /> Price To~al <br />Ni" $ 23.50 $ 3~6.00 <br />2 20.50 12,956.00 <br />3 19.75 25,398.50 <br />~ 18.75 13,931.25 <br />i~ 17.50 5,705.00 <br /> 16.75 9,731.75 <br />? 1,525.00 1,525.00 <br />8 1,825.00 1,825.00 <br />9 1,300.00 1,300.00 <br />l0 1,900.00 1,900.00 <br />11 3,050.00 3,050.00 <br />12 1,575.oo 1,575.oo <br />13 1,250.00 1,250.00 <br />14 400.00 800.00 <br /> <br />~ran~ Total <br /> <br />$115,163.50 <br /> <br />Bid of A.H.Famularo: <br />Bond in the sum of 10%. <br /> <br />I~em Unit <br />No Price· Total <br />~ $ 29.00 $ ~.o0 <br />z 24.85 15,7o5.2o <br />3 23.50 30,221.00 <br />4 19.80 14,711.40 <br />~ 18.45 6,014.70 <br /> 16-.50 9,586.50 <br />7 1,500.oo 1,5o0.o0 <br />8 1,5o0.o0 1,50o.oo <br />9 980.00 980.00 <br />10 2,000.00 2,000.00 <br />11 2,850.00 2,850.00 <br />12 1,630.00 1,630.00 <br />~ 1,600.00 1,600.00 <br /> 650.00 1,300.00 <br /> <br />$131,822.80 <br /> <br /> <br />