Laserfiche WebLink
PITBLIC WORKS STANDARD REO% IRLMkNq S <br /> <br />Prio~- to the Is.~u~snce oF a Bui].d[nq Permit <br /> <br />Submit to the Department of Public Works, for..their approval, <br />an acceptable final grading plan or an ~n-site drainage plan <br />or both, showing the direction and means of flow to the <br />adjacent street(s) or channel(s) when this property is <br />developed. Plan is to include existing and proposed eleva- <br />tions at the property lines. Applicants should check with <br />the Department of Public Works for extent of study needs. <br /> <br />2. Submit a sanitary sewer study to the Department of Public Works. <br /> <br />Submit to the Department of Public Works a runoff study based <br />on a storm of a ten-year* frequency to show existing and <br />proposed facilities and methods of draining this site and <br />tributary areas without exceeding the capacity of any street, <br />on-site or off-site. <br /> <br />*twenty-five for sump condition <br /> <br />4. Submit an on-site water system study and plan to the Depart- <br /> ment of Public Works. <br /> <br />5. Dedicate required street or alley right of way. <br /> <br />Provide a ten-year continuing offer <br />street right of way. <br /> <br />Dedicate vehicular access rights. <br /> <br />of dedication for required <br /> <br />8. Provide construction plans for: <br /> <br />a. required street improvement,. <br /> sewer system, <br />c. storm drain system, <br /> water system, <br />e. other. <br /> <br />9. Reserved. <br /> <br />10. Pay drainage assessment fee. <br /> <br />11. Pay City sanitary sewer main assessment fee. <br /> <br />~2. Pay special sewer agreement reimbursement fee. <br /> <br />13. P.ay Sanitation District No. 7 fee. <br /> <br />14. Pay City water main charges. <br /> <br />15. Pay water service connection charges. <br /> <br />16. Pay street lighting deposit for future street lights. <br /> <br />17. Pay street tree charges. <br /> <br />- 1 - <br /> <br /> <br />