Laserfiche WebLink
In Re <br />Bid acceptance <br />Valves and hydrants <br /> <br />Bid of Worthington-Gamon Meter Division: <br />Item 1. Total $23,730.00 <br /> " 2. " 2,613.00 Grand Total $26,343.00. <br />Terms: Net 30 days. Delivery: as specified. <br /> <br />Bid of Mission Pipe and Supply Company: <br />Item 1. Total $23,890.00 <br />" 2. " 2,611.00 Grand Total $26,501.00. <br /> <br />Bid of Hersey Manufacturing Company~ <br />Item 1. Total $24,250.00 <br /> " 2. " 2,677.50 Grand r~tal $26,927.50. <br />Terms: net 30 days; <br /> <br />Bid of Badger Meter Mfg. Company: <br />Item 1. Total $24,150.00 <br /> " 2. " 2,659.00 Grand Total $26,809.00. <br /> <br />On recommendation of the Manager a~d on motion of Councilman Heinly, <br /> <br />seconded by Jerome and carried, <br />Division was accepted on Item 1. <br />seconded by Jerome and carried, <br /> <br />the bid of Worthington-Gamon Meter <br /> <br /> On motion of Councilman Heinly, <br />the bid of Mission Pipe and Supply <br /> <br />Company was accepted on Item 2~and all other bids rejected. <br />H <br />A tabulation of bids was presented by the Manager for the furnishing <br />of valves and hydrants, specification No. 633/665-1, as fol3ows: <br /> <br />Bid of Mueller Co.: <br />Item 1. Total $7,711.20 <br /> " 2. " 1,865 .92 <br /> " 3 · " 1,254.60 <br /> " 4. NO bid .Terms: 2% - 30 days <br /> <br />Crane Company: <br />Item 1. Total $7,722.00 <br /> " 2. " 1,794.80 <br /> " 3. " 1,288.80 <br /> " 4. " 12,6~.00 <br /> <br />Bid of Rensselaer Valve Company: <br />Item 1 Tote~l $9,234.00 <br />" 2 " 2,220.12 <br />" ~ " 1,521.18 <br />" " 10~246.50 <br />90 - 6", 14 - 8", and 9 - 12" gate valves, and 45 hydrants will be <br />delivered within 45 days after date of award of the contract. The <br />balance of the valves and hydrants will be delivered within 90 days. <br />Terms: 1/2 of 1% 10 - net 30 days. <br /> <br />Bid of <br />Item 1 <br /> " 2 <br /> " 3 <br /> " 4 <br /> <br />Howard Supply ~omp~any: <br /> Total $7,6~5.~0 <br /> " 1,8 8.00.. <br /> " 1,294.02 <br /> " 13,014.00 <br /> <br />Bid of Pacific <br />Item 1 Total <br /> " 2 " <br /> " 3 <br /> <br />States Cast Iron Pipe Company: <br /> $8,517.60 <br /> 1,401.12 <br /> 10,312.20 <br /> <br /> Bid of Mission Pipe and Supply Company: <br />Item 1 TOtal $7,650.00 <br /> " 2 " 1,8~8.00 <br /> " 3 " ~ 1,228.50 <br /> " 4 " 12,654.00 <br />2% cash discount 30 days will be allowed on all above items. <br /> <br />Bid Of <br />Item 1 <br /> " 2 <br /> " 3 <br /> <br />Rich Manufacturing Company of California: <br /> Total $9,216.00 . <br /> " · 2,217.60 <br /> " 1,602.00 <br /> No'~bid <br /> <br />Bid of Grinnell Company: <br />Item 1 Total $8,460.00 <br /> " 2 " 2,072.00 <br /> " 3 " 1,395.00 <br /> " ~ " 12,960.00 <br />~ex'ms - 2% 10th Prox. <br /> <br />On recommendation of the Manager and on motion of Councilman Heinly, <br />seconded by Jerome and carried, the bid of Mueller Company was accepts. <br />on Items 1 and 3; the bid of Crane Company was accepted on Item 2 and <br />th~ bid of Rensselaer Valve Company was accepted on Item 4; all other <br />bids rejected. <br /> <br /> <br />