In Re
<br />Bid acceptance
<br />Valves and hydrants
<br />
<br />Bid of Worthington-Gamon Meter Division:
<br />Item 1. Total $23,730.00
<br /> " 2. " 2,613.00 Grand Total $26,343.00.
<br />Terms: Net 30 days. Delivery: as specified.
<br />
<br />Bid of Mission Pipe and Supply Company:
<br />Item 1. Total $23,890.00
<br />" 2. " 2,611.00 Grand Total $26,501.00.
<br />
<br />Bid of Hersey Manufacturing Company~
<br />Item 1. Total $24,250.00
<br /> " 2. " 2,677.50 Grand r~tal $26,927.50.
<br />Terms: net 30 days;
<br />
<br />Bid of Badger Meter Mfg. Company:
<br />Item 1. Total $24,150.00
<br /> " 2. " 2,659.00 Grand Total $26,809.00.
<br />
<br />On recommendation of the Manager a~d on motion of Councilman Heinly,
<br />
<br />seconded by Jerome and carried,
<br />Division was accepted on Item 1.
<br />seconded by Jerome and carried,
<br />
<br />the bid of Worthington-Gamon Meter
<br />
<br /> On motion of Councilman Heinly,
<br />the bid of Mission Pipe and Supply
<br />
<br />Company was accepted on Item 2~and all other bids rejected.
<br />H
<br />A tabulation of bids was presented by the Manager for the furnishing
<br />of valves and hydrants, specification No. 633/665-1, as fol3ows:
<br />
<br />Bid of Mueller Co.:
<br />Item 1. Total $7,711.20
<br /> " 2. " 1,865 .92
<br /> " 3 · " 1,254.60
<br /> " 4. NO bid .Terms: 2% - 30 days
<br />
<br />Crane Company:
<br />Item 1. Total $7,722.00
<br /> " 2. " 1,794.80
<br /> " 3. " 1,288.80
<br /> " 4. " 12,6~.00
<br />
<br />Bid of Rensselaer Valve Company:
<br />Item 1 Tote~l $9,234.00
<br />" 2 " 2,220.12
<br />" ~ " 1,521.18
<br />" " 10~246.50
<br />90 - 6", 14 - 8", and 9 - 12" gate valves, and 45 hydrants will be
<br />delivered within 45 days after date of award of the contract. The
<br />balance of the valves and hydrants will be delivered within 90 days.
<br />Terms: 1/2 of 1% 10 - net 30 days.
<br />
<br />Bid of
<br />Item 1
<br /> " 2
<br /> " 3
<br /> " 4
<br />
<br />Howard Supply ~omp~any:
<br /> Total $7,6~5.~0
<br /> " 1,8 8.00..
<br /> " 1,294.02
<br /> " 13,014.00
<br />
<br />Bid of Pacific
<br />Item 1 Total
<br /> " 2 "
<br /> " 3
<br />
<br />States Cast Iron Pipe Company:
<br /> $8,517.60
<br /> 1,401.12
<br /> 10,312.20
<br />
<br /> Bid of Mission Pipe and Supply Company:
<br />Item 1 TOtal $7,650.00
<br /> " 2 " 1,8~8.00
<br /> " 3 " ~ 1,228.50
<br /> " 4 " 12,654.00
<br />2% cash discount 30 days will be allowed on all above items.
<br />
<br />Bid Of
<br />Item 1
<br /> " 2
<br /> " 3
<br />
<br />Rich Manufacturing Company of California:
<br /> Total $9,216.00 .
<br /> " · 2,217.60
<br /> " 1,602.00
<br /> No'~bid
<br />
<br />Bid of Grinnell Company:
<br />Item 1 Total $8,460.00
<br /> " 2 " 2,072.00
<br /> " 3 " 1,395.00
<br /> " ~ " 12,960.00
<br />~ex'ms - 2% 10th Prox.
<br />
<br />On recommendation of the Manager and on motion of Councilman Heinly,
<br />seconded by Jerome and carried, the bid of Mueller Company was accepts.
<br />on Items 1 and 3; the bid of Crane Company was accepted on Item 2 and
<br />th~ bid of Rensselaer Valve Company was accepted on Item 4; all other
<br />bids rejected.