Laserfiche WebLink
TABLE I - iCONTINUED <br /> <br /> -~ ~-~ o~'o $ o o O <br />Paving $ 70,625 <br /> <br />Striping $ 1,700 $ 350 $ 1,800 $ 4,720 <br /> 26,000 ft 5,000 ft 27,000 ft <br />Signing $ 900 $ 400 $ 2,400 <br />Acquisition <br />Pedestrian $ 70,0001 <br />Lights <br />Landscaping <br />TOTAL $ 1,700+ $ 350+ $ 1,800 $147,7454. <br /> <br />1While pedestrian lights are preferable, the cost of <br />implementation could be considerably lessened by the <br />use of vehicular stop signs on these streets. <br /> <br /> <br />