Laserfiche WebLink
RESOLUTION NO. 75-24 <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF <br />CITY OF SANTA ANA ESTABLISHING A SC~6~ <br />~FEES FOR PERMITS TO MOVE BUILDINGS AND <br />PERFORM CONSTRUCTION WORK WITHIN THE STREET <br />RIGHTS OF WAY AND EASEMENTSOFTHE CITY OF <br />SANTA ANA <br /> <br /> WHEREAS, Sections 8-1801 and 33-31 of the Santa Ana <br />Municipal Code provide for the establishment of fees for per- <br />mits to move buildings and perform construction work within <br />the street rights of way and easements of the City, and <br /> <br /> WHEREAS, fees were last revised in 1955 and increased <br />costs since then now require an upward adjustment in such per- <br />mit fees. <br /> <br /> NOW, THEREFORE, BE IT RESOLVED: That the following <br />permit fees be collected from applicants for permits for moving <br />buildings and performing construction work within street rights <br />of way and easements of the City as provided for in Sections <br />8-1801 and 33-31 of the Santa Ana Municipal Code. The fees <br />for permits to perform work under said Code sections are hereby <br />established by the following fee schedule: <br /> <br />Permit issuance fee to be added to <br />all other fees. <br /> <br />$ 5.00 <br /> <br />e <br /> <br />Trench excavation and backfill unless <br />included below: <br /> <br />a. In dirt, per linear foot. 0.03 <br />b. In paving, per linear foot. 0.05 <br /> <br />Sewer mains, water mains, storm drains, <br />culverts and lined channels, including <br />earthwork: <br /> <br />a. In dirt, per linear foot. 0.15 <br />b. In paving, per linear foot. 0.20 <br /> <br />Sewer laterals and water services, <br />including earthwork, each <br /> <br />4.00 <br /> <br />Manholes, vaults, catch basins and junction <br />chambers, including earthwork, each 13.00 <br /> <br />6. Curb, gutter or oombination curb and gutter, <br /> including earthwork, per linear foot. 0.08 <br /> <br />7. Curb return, including earthwork, each. 4.00 <br /> <br />8. Sidewalk and driveway, including earth- <br /> work, per square foot <br /> <br />0.02 <br /> <br />9. Paving, including earthwork, per square <br /> foot. <br /> <br />0.01 <br /> <br />10. <br /> <br />Fencing, including earthwork: <br />a. Masonry, concrete or block, per linear <br /> foot. 0.10 <br />b. Other, per linear foot. 0.05 <br /> <br />- 1 - <br /> <br /> <br />