Laserfiche WebLink
Project Information <br /> <br /> FLOWER STREET <br />CiviC Center Drive to Seventeenth Street <br /> <br />When we received AHFP allocations totaling $155,000 the past two ,years we assumed <br />that the $310,000 budget would cover the cost of right of way acquisition for widen- <br />ing Flower Street between Civic Center Drive and Seventeenth Street. <br /> <br />Recent appraisals have indicated a much higher cost for this right of way for several <br />reasons. Land values are much higher than anticipated a couple of years ago. Secondly, <br />a number of the buildings which we had planned'on cutting off and re-facing must be <br />removed because the cost to bring them up to code is prohibitive. As a result, we <br />are faced with a sizeable amount of relocation assistance to the tenants. These <br />factors, combined with a considerable amount of damages due to remaining sub-standard <br />lot sizes, have resulted in a revised estimate of $920,000 for the right of way for <br />this project. <br /> <br />We are asking for an additional $305,000 AHFP allocation for this project. Con- <br />struction funds were allocated in 1975-76. <br /> <br />.C. OV£R A.E ' <br />~¢ R£OUIRED ._ <br /> <br />EX/STING <br /> <br />PROPO,YED <br /> <br /> ~YMM£TRICAL ABOUT <br />TY'I~ICAI. CROSS ~SECTIOiV <br /> <br />OWEt 3T- CIVIC CENTER DR 7o 3EVEIVT£EIVTH 3[ <br /> <br /> <br />