Laserfiche WebLink
8 <br /> <br /> These fees include all switches, circuit breakers, <br />contractors, relays, and other directly related control equipment. <br /> <br /> Outlets and general use switches, each ......... 25 <br /> NOTE: Each five {5) feet or fraction <br /> thereof of multiple outlet assembly <br /> shall be counted as one {1) outlet. <br /> <br /> Signs and high potential gas tube lighting, <br /> each .......................................... 10.00 <br /> NOTE: This shall include all necessary <br /> control equipment. <br /> <br /> Temporary service: <br /> <br /> Temporary electric service prior to <br /> final approval or occupancy, each meter.. 35.00 <br /> <br /> Temporary work with service (occupied <br /> residential), each meter ................. 10.00 <br /> <br /> Tmmporary work with service (occupied <br /> commercial), each meter .................. 15.00 <br /> <br /> Temporary power - construction: <br /> <br /> For services supplying a temporary power <br /> pole, pedestal, or piggyback ............. 5.00 <br /> <br /> For a system of distribution and utiliza- <br /> tion poles for temporary construction <br /> power, each pole ......................... 3.00 <br /> <br /> Temporary construction lighting: <br /> 500 lamps or less ........................ 2.00 <br /> Over 500 lamps ........................... 4.00 <br /> Time clock or photo electric cell, each ....... 2.00 <br /> <br />Swimming pool, fountains, spas ................ 35.00 <br /> <br />Busways, special raceways, under floor duct, <br />trolley or plug-in busways each one hundred <br />(100) feet or fraction thereof ................ 5.00 <br /> <br />Annual maintenance permit ..................... 25.00 <br /> <br />Switchboard, motor control center or similar <br />equipment changes or additions: <br /> <br />First section ............................ 15.00 <br />Each additional section .................. 8.00 <br />Fire protective signaling systems: <br /> <br /> Outlet and each smoke or heat detector <br /> or sensor ................................. 25 <br /> <br /> Minimum fee per anyone (1) system ....... 5.00 <br /> <br />Inspections for which no fee is herein prescribed: <br /> <br /> Each inspection - per hour ............... 15.00 <br /> <br /> Minimum charge - per half-hour (~) hour <br /> or less .................................. 15.00 <br /> <br /> <br />