Laserfiche WebLink
RESOLUTION NO. 82- 119 <br />Page ten <br /> <br />10) <br /> <br />il) <br /> <br />i2) <br /> <br />NOTE: <br /> <br />i3) <br /> <br />14) <br /> <br />15) <br /> <br />16) <br /> <br />i7) <br /> <br />For the installation or relocation <br />of each boiler or compressor over <br />30 horsepower to and including 50 <br />horsepower, or for each absorption <br />system over 1,000,000 BTU/h to and <br />including 1,750,000 BTU/h ................. $22.50 <br /> <br />For the installation or relocation <br />of each boiler or refrigeration com- <br />pressor over 50 horsepower, or each <br />absorption system over 1,750,000 BTU/h .... $37.50 <br /> <br />For each air-handling unit to and <br />including 10,000 cubic feet per <br />minute, including ducts attached <br />thereto ................................... $ 4.50 <br /> <br /> This fee shall not apply to an air-handling unit <br /> which is a portion of a factory-assembled~appli- <br /> ance, cooling unit,.evaporative cooler or absorp- <br /> tion unit for each a permit is required elsewhere <br /> in this code. <br /> <br />For each air-handling unit over <br />10,000 cfm ........................... - ..... $10.00 <br /> <br />For each evaporative cooler other <br />than portable type ........................ $ 5.00 <br /> <br />For each ventilation fan connected <br />to a single duct .......................... $ 4.00 <br /> <br />For each ventilation system which <br />is not a portion of any heating or <br />air-conditioning system authorized <br />by a permit ................... . ........... $ 4.50 <br /> <br />For the installation of each hood <br />which is served by mechanical ex- <br />haust, including the ducts for such <br />hood ...................................... $ <br /> <br />4.50 <br /> <br />18) For the installation or relocation <br /> of each domestic-type incinerator ......... $ 7.50 <br /> <br /> <br />