Laserfiche WebLink
RESOLUTION NO. 82- 119 <br />Page seven <br /> <br /> Temporary work with service, each meter ........ 15.00 <br />Temporary power - construction: <br /> <br /> For services supplying a temporary <br /> power pole, pedestal or piggyback .............. 15.00 <br /> <br /> For a system of distribution and <br /> utilization poles for temporary <br /> construction power, each pole ................... 3.00 <br /> <br />Temporary construction lighting: <br /> 500 lamps or less ............................... 2.00 <br />Over 500 lamps ................................. ~'.00 <br />Time clock or photo electric cell, each ............. 3.00 <br /> ........ 35.00 <br /> <br />Swimming pool, fountains, spas ............. <br /> <br />Busways, special raceways, under floor duct <br />trolley or Plug-in busways each one hundred <br />(100) feet or fraction thereof ............. <br /> <br /> ......... 5.00 <br />Annual maintenance permit .......................... 50.00 <br /> <br />Sub-panel, switchboard, motor control center <br />or similar equipment changes or additions: <br /> <br /> First section .................................. 15.00 <br /> Each additional section ........................ 10.00 <br />Fire protective signaling systems: <br /> <br /> Each smoke detector, heat detector or <br /> fire damper sensor and'lock device ............. 50 <br /> <br /> Minimum fee per any one (1) system ............. 10.00 <br /> <br />Other Inspections and Fees: <br /> <br /> 1) Inspections outside of normal business <br /> hours (minimum charge - two (2) hours) ....... $25.00 per hour <br /> <br /> <br />