Laserfiche WebLink
RESOLUTION NO. 83-91 <br />Page ten <br />15 horsepower, or each absorption - <br />system over 100,000 BTU/h and in- <br />cluding 500,000 BTU/h.....................$11.00 <br />9) For the installation or relocation <br />of each boiler or compressor over <br />15 horsepower to and including 30 <br />horsepower, or each absorption sy- <br />stem over 500,000 BTU/h to and in- <br />cluding 1,000,000 BTU/h...................$15.00 <br />10) For the installation or relocation <br />of each boiler or compressor over <br />30 horsepower to and including 50 <br />horsepower, or for each absorption <br />system over 1,000,000 BTU/h to and <br />including 1,750,000 BTU/h.................$22.50 <br />11) For the installation or relocation <br />of each boiler or refrigeration com- <br />pressor over 50 horsepower, or each <br />absorption system over 1,750,000 BTU/h....$37.50 <br />12) For each air -handling unit to.and <br />including 10,000 cubic feet per <br />minute, including ducts attached <br />thereto ...................................$ 4.50 <br />NOTE: This fee shall not apply to an air -handling unit <br />which is a portion of a factory -assembled appli- <br />ance, cooling unit, evaporative cooler or absorp- <br />tion unit for each a permit is required elsewhere <br />in this code. <br />13) For each air -handling unit over <br />10,000 cfm.........................:......$10.00 <br />14) For each evaporative cooler other <br />than portable type ........................$ 5.00 <br />15) For each ventilation fan connected <br />to a single duct ..........................$ 4.00 <br />16) For each ventilation system which <br />is not a portion of any heating or <br />air-conditioning system authorized <br />bya permit..% ............................$ 4.50 <br />