Laserfiche WebLink
RESOLUTION NO. 83-91 <br />Page fifteen <br />100,001 cubic yards or more --$562.00 for the first <br />100,000 cubic yards, plus $22.50 for each additional <br />10,000 cubic yards or fraction thereof. <br />Other Inspections and Fees: <br />1) <br />Inspections outside of normal <br />business hours (minimum charge - <br />two (2) hours).............................$35.00 <br />per hour <br />2) <br />Reinspection fee assessed under <br />provisions of Section 305(8), <br />Uniform Building Code......................$35.00 <br />each <br />3) <br />Inspections for which no fee is <br />specifically indicated (minimum <br />charge - one (1) hour ......................$35.00 <br />per hour <br />4) <br />Additional plan review required by changes, <br />additions or revisions to approved plans <br />(minimum charge - one (1) hour.............$35.00 <br />per hour <br />Plancheck Fees: <br />Whenever grading plans are required by the Director, a plancheck <br />fee equal to 508 of the grading permit fee shall be paid at <br />the time of submitting plans. <br />F. SOLAR ENERGY CODE. <br />Any person desiring a permit required by the Solar <br />Energy Code, shall, at the time of filing an application <br />therefor, pay a fee equal to $10.00 plus the sum of the fees <br />for the work to be done under the permit as set forth in the <br />following schedule, provided, however, that the minimum fee <br />for the issuance of any permit shall be $35.00. <br />NOTE: These fees do not include permit fees for any parts <br />of the solar system which are subject to the require- <br />ments of other applicable codes. <br />Unit Fee Schedule: <br />1) For collectors (including related piping <br />and regulating devices): <br />