Laserfiche WebLink
RESOLUTION NO. 83- 91 <br />Page seven <br />The following fees include all switches, receptacles, fixtures, <br />circuit breakers, contractors, relays, and other directly <br />related control equipment. <br />Outlets, light fixtures and general <br />use switches, each .................................$ .50 <br />Signs and high potential gas tube <br />lighting, each... ........ .........15.00 <br />NOTE: This shall include all necessary <br />control equipment. <br />Temporary service: <br />Temporary electric service prior to <br />final approval or occupancy, each meter........ 35.00 <br />Temporary work with service, each meter........ 15.00 <br />Temporary power - construction: <br />For services supplying a temporary <br />power pole, pedestal or piggyback..............15.00 <br />For a system of distribution and <br />utilization poles for temporary <br />- construction power, each pole...................3.00 <br />Temporary construction lighting: <br />500 lamps or less...............................2.00 <br />Over 500 lamps..................................4.00 <br />Time clock or photo electric cell, each..............3.00 <br />Swimming pool, fountains, spas......................35.00 <br />Busways, special raceways, under floor duct, <br />trolley or plug-in busways each one hundred <br />(100) feet or fraction thereof .......................5.00 <br />Annual maintenance permit...........................50.00 <br />Sub -panel, switchboard, motor control center <br />or similar equipment changes or additions: <br />First section..................................15.00 <br />Each additional section ........................10.00 <br />