Laserfiche WebLink
b) <br /> <br />Submit an on-site drainage flow plan to the Public <br />Services Agency for approval. <br /> <br />c) <br /> <br />Submit alley and street improvement plans to the Public <br />Service~ Agency for required off-site improvements. <br /> <br />d) <br /> <br />e) <br /> <br />Submit a revised site plan showing the drive approach on <br />First Street located 28 to 30 feet westerly of the <br />centerline as shown. The new drive approach centerline <br />which will be approximately 1go feet west of the <br />centerline of Lyon Street. <br /> <br />Pay a drainage assessment fee to the Public Services <br />Agency as required. <br /> <br />f) Pay a 1% Transportation System improvement fee per <br /> Municipal Code Section 8-44. <br /> <br />Prior to a utility release on any building complete the <br />following: <br /> <br />a) <br /> <br />Remove and reconstruct the existing alley from the north <br />alley property line to the new south alley property line <br />per City Standard III across the entire project. <br /> <br />b) <br /> <br />NOTE: The portion of alley gutter existing and the <br />pavement northerly therof may remain. The power pole <br />existing must be relocated to the south side of the new <br />alley. <br /> <br />Remove and reconstruct the curb return including all <br />other related facilities at the corner of First and Lyon <br />Streets with a 35 feet radius curb return. Other related <br />facilities includes the fire hydrant, traffic signal, <br />utility vault venting, adjacent paving including drain <br />gutters and any other related items necessary to complete <br />the return, i.e., sidewalk landing with a wheelchair <br />ramp, etc. <br /> <br />c) .Remove and' close all existing drive approaches with curb <br /> and gutter as required both on First and Lyon Streets. <br /> <br />d) <br /> <br />Remove and reconstruct all existing sidewalk where <br />damaged and construct sidewalk between existing curb and <br />sidewalk with street tree wells. <br /> <br />e) <br /> <br />Plant street trees on First and Lyon Streets per City <br />Standard Plan 124 as required by the Publtc Services <br />Agency. <br /> <br />f) <br /> <br />Construct ornamental street lighting on Lyon Street with <br />underground power distribution. <br /> <br />g) <br /> <br />Construct a new drive approach at the alley from curb to <br />property line per City Standard 112A. <br /> <br /> <br />